Skip to content

Bid Board

1,264 live construction bids & tenders

Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.

SAM.govCloses in 18 days

61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF

CONTACT INFORMATION|4|N761.37|P1G|215-697-2983|ETHAN.STEIN@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X|||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1B || This amendment reduces QTY from 14EA to 4EA. All contractual documents (i.e. contracts, purchase orders, task orders delivery orders and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: MOTOR,ALTERNATING C ;6105 008807012 ; NSN , ;123SCAM101 ; Part Number, Shall be performed IAW: MOTOR,ALTERNATING C ;LATEST APPLICABLE REPAIR TECHNICAL; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.4 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MOTOR,ALTERNATING C ;123SCAM101; P/N, ;6105-00-880-7012; NSN, ;ALL AVAILABLE REPAIR MANUALS DRAWINGS AND SPECIFICATIONS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. MOTOR,ALTERNATING C ;NORTHROP GRUMMAN SYSTEMS CORP D/B/A INTEGRATED SYSTEMS ; Company Name , ;2000 W NASA BLVD MELBOURNE STATE: FL ZIP: 32904-2322; Address , ;(70974); Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES NOTE 1. THE CONTRACTOR SHALL REPAIR AND TEST EACH ITEM USING APPROVED ATP ACCEPTED BYTHE GOVERNMENT. THE CONTRACTOR MUST ALSO IDENTIFY ALL SPECIAL TOOLS AND TEST EQUIPMENT REQUIRED FOR REPAIRS/OVERHAULS/MODIFICATIONS OF SUBJECT ITEM(S) IN THE CONTRACT. NOTE 2. WHEN SOLICITATION/CONTRACT CITES NAVSUPWSSIA18, NAVSUPWSSIA19, OR EQUIVALENT "CONFIGURATION MANAGEMENT" CLAUSE, WHERE CLASS I ECP(S) ARE PREPARED I/A/W DI-CMAN-80639C AND FOR CLASS II DEVIATION/WAIVER(S) ARE PREAPARED I/A/W DI-CMAN-80640C WITH ALL REQUIRED INFORMATION, THEN DD FORM 1423 DOCUMENTS FOR SUCH SHALL NOT BE ATTACHED AS A CDRL REQUIREMENT TO THIS SOLICITATION/ CONTRACT.

United States
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

DOOR,ACCESS,AIRCRAF

CONTACT INFORMATION|4|N793.12|N00383|771-229-0455|jessica.l.harpel2.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports (combo)||N/A|N00383|N/A|N/A|N/A|N/A||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Jessica Harpel| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 year after date of delivery |45 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Estimated RTAT for this requirement is 119 days. Note: The RTAT will result in an enforceable delivery date unless covered by an excusable or Government delay. Your RTAT shall include the time to repair the carcass to "A" condition and packaging/shipment back to the Navy. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: DOOR,ACCESS,AIRCRAF ;74A304135-1021; P/N, ;1560 016882813; NSN, ;OEM Tech Drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. DOOR,ACCESS,AIRCRAF ;THE BOEING COMPANY; Company Name , ;DEFENSE, SPACE & SECURITY DIVISION 6200 J S MCDONNELL BLVDSAINT LOUIS, MO 63134 ; Address , ;0PXV4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

United States
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

COVER,ACCESS,AIRCRA

CONTACT INFORMATION|4|N793.12|N00383|771-229-0455|jessica.l.harpel2.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports (combo)||N/A|N00383|N/A|N/A|N/A|N/A||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Jessica Harpel| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 year after date of delivery |45 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

United States
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

NRP,LH SECONDARY PA

CONTACT INFORMATION|4|N721.28|LPA|2156973473|gerard.t.weiss.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00383|TBD|TBD|SEE SCHEDULE |TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Please submit quote via email to gerard.t.weiss.civ@us.navy.mil the due date specified on page 1, block 10. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT:###### days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. This RFQ is for repair. This RFQ is in accordance with FAR part 15. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;HONEYWELL INTL INC; drawing number ( ;70210; ) ;67000014-1-1; , Revision ;LATEST; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: NRP,LH SECONDARY PA ;67000014-1-1; P/N, ;1680-016185512; NSN, ;LATEST; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. NRP,LH SECONDARY PA ;HONEYWELL INTL INC; Company Name , ;2525 W. 190TH STREET TORRANCE, CA 90504-6002; Address , ;70210; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

United States
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

16--HEAT EXCHANGER,FLUI, IN REPAIR/MODIFICATION OF

CONTACT INFORMATION|4|N733.16|M5M|771_229_3066|michael.j.keith40.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo|Source|TBD|N00383|TBD|TBD|See Schedule|TBD|See Schedule|||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 Days|45 Days Of The Last Delivery Under This Contract||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This RFQ is for NAVY repair. Repair Turnaround Time(RTAT): the resultant contractual delivery requirement is measured from asset return to the date of asset acceptance under the terms of the contract. For purpose of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor us required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of the physical receipt. The contractor must obtain final inspection and acceptance by the government for all assets within the RTATs established in this contract. This RFP is for repair. NAVSUP WSS requests that contractors submit a quote that includes either a firm-fixed price quote. Quotes may be emailed to the below email address and must be received on or before on the closing date listed on page 1 of the solicitation. michael.j.keith40.civ@us.navy.mil. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \

United States
Due Oct 26, 2026View bid
LA RAMPCloses in 18 days

2027PS001 - Campus-Wide Fire Alarm System Replacement

California
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

SOLICITATION NOTICE DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona

SOLICITATION NOTICE - DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona. The U.S. Army Corps of Engineers (USACE), Los Angeles District, has a requirement for the Design-Build to Budget (DB2B) of the Airborne Equipment Parachute Repair Facility at Yuma Proving Ground, Arizona.This acquisition is a 100 percent Total Small Business Set-Aside conducted in accordance with RFO FAR Part 19 and RFO FAR 36.101-2. The Government is utilizing a Two-Phase Design-Build strategy under a single solicitation. Phase 1 involves a qualification pre-selection process to shortlist up to three (3) of the most highly qualified offerors. Only those selected will be invited to Phase 2 via solicitation amendment. Award will be a competitive Firm-Fixed-Price contract made to the Highest Technically Rated Offeror within the fixed budget ceiling.NAICS: 236220 (Commercial and Institutional Building Construction), size standard $45,000,000.00. PSC: Y1EZ - Construction Of Other Industrial Buildings. Period of Performance: 760 calendar days from receipt of Notice to Proceed.SUBMISSION AND REGISTRATION REQUIREMENTS:Submission Portal: All proposals for solicitation W912PL26RA046 must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. In order to submit a proposal, contractors must first be registered with the Proposal Manager role in PIEE. Hard copy, email, or facsimile submissions will NOT be accepted.System for Award Management (SAM): All offerors, including any Joint Venture (JV) entities, must have an active and valid registration in the SAM database at the time of proposal submission to be eligible for award. Proposals from contractors without an active SAM registration will not be considered. Registration is free of charge.Amendments: All solicitation documents, amendments, and communications will be posted to both the SAM database and the PIEE Solicitation Portal. It is the responsibility of the offeror to monitor these websites for updates. The Government is not responsible for any inability to access the websites.All Offers and Bidders are also advised that this procurement may be delayed, canceled, or revised at any time during the solicitation, evaluation, and final award process.

United States
Due Oct 26, 2026View bid
SAM.govCloses in 18 days

PRESOLICITATION NOTICE (SYNOPSIS): DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona

SOLICITATION NOTICE - DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona. The U.S. Army Corps of Engineers (USACE), Los Angeles District, has a requirement for the Design-Build to Budget (DB2B) of the Airborne Equipment Parachute Repair Facility at Yuma Proving Ground, Arizona.This acquisition is a 100 percent Total Small Business Set-Aside conducted in accordance with RFO FAR Part 19 and RFO FAR 36.101-2. The Government is utilizing a Two-Phase Design-Build strategy under a single solicitation. Phase 1 involves a qualification pre-selection process to shortlist up to three (3) of the most highly qualified offerors. Only those selected will be invited to Phase 2 via solicitation amendment. Award will be a competitive Firm-Fixed-Price contract made to the Highest Technically Rated Offeror within the fixed budget ceiling.NAICS: 236220 (Commercial and Institutional Building Construction), size standard $45,000,000.00. PSC: Y1EZ - Construction Of Other Industrial Buildings. Period of Performance: 760 calendar days from receipt of Notice to Proceed.SUBMISSION AND REGISTRATION REQUIREMENTS:Submission Portal: All proposals for solicitation W912PL26RA046 must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. In order to submit a proposal, contractors must first be registered with the Proposal Manager role in PIEE. Hard copy, email, or facsimile submissions will NOT be accepted.System for Award Management (SAM): All offerors, including any Joint Venture (JV) entities, must have an active and valid registration in the SAM database at the time of proposal submission to be eligible for award. Proposals from contractors without an active SAM registration will not be considered. Registration is free of charge.Amendments: All solicitation documents, amendments, and communications will be posted to both the SAM database and the PIEE Solicitation Portal. It is the responsibility of the offeror to monitor these websites for updates. The Government is not responsible for any inability to access the websites.All Offers and Bidders are also advised that this procurement may be delayed, canceled, or revised at any time during the solicitation, evaluation, and final award process.

United States
Due Oct 26, 2026View bid
Delaware Open BidsCloses in 18 days

OPEN END- BITUMINOUS PATCHING, SOUTH, FY27-FY29

Delaware
Due Oct 27, 2026View bid
Delaware Open BidsCloses in 18 days

Northeast State Service Center Reimagining Project

Delaware
Due Oct 27, 2026View bid
Find a Tender (UK)Closes in 18 days

Minor Archaeological Services Call-Off Contract

Historic Environment Scotland (HES) requires a call off contract to be put in place for minor archaeological services.

Edinburgh, Scotland£480,000 (est.)Demolition
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Lone Cone Chinking, GMUG NF, Norwood Road, Colorado

ATTENTION: SOLICITATION AND ALL SUPPORTING DOCUMENTS ARE LOCATED IN THE ATTACHMENTS/LINKS Project Title: Lone Cone Chinking, GMUG NF, Norwood Road, Colorado Description: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0187 is issued as a Request for Quotation (RFQ) for removal and replacement of chinking material on building exterior. Contractor is required to prepare exterior log surface to ensure optimal adhesion. The Lone Cone Cabin is a rental facility in the summer months and an outfitter cabin in the winter months located on the Grand Mesa, Uncompahgre, and Gunnison National Forest on the Norwood Ranger District. This is a log cabin built in the late 1940s. There are large gaps between the logs and holes from woodpeckers and other varmints, throughout the exterior of the cabin. This has allowed rodents and insects to infest the cabin’s interior. It is unknown when the last time any chinking maintenance was done on this cabin. However, it is apparent that the Lone Cone Cabin is in dire need of this service. Project Location: Grand Mesa, Uncompahgre, and Gunnison (GMUG) National Forests Norwood Road/Recreation, Colorado. Latitude 37°53'35.3"N, Longitude 108°09'31.1"W This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238390 - Other Building Finishing Contractors The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 52.228-1 Bid Bond/Offer Guarantee: A bid bond/offer guarantee shall be submitted at time of offer on a Standard Form 24 (SF24), Failure to provide the bid bond will render the offer non-responsive, resulting in its rejection. The required guarantee amount is 20% of the total offer price, not to exceed a maximum of $3 million. Alternative Payment Protections FAR 52.228-13 (July 2000) (a) The Contractor shall submit the following payment protections: Payment Bonds (b) The amount of the payment protection shall be 100% of the contract price. (c) The submission of the payment protection is required within 10 days of contract award. (d) The payment protection shall provide protection for the full contract performance period plus a one-year period. (e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties. (f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement. (End of clause) Payment Bond must be submitted using the mandatory Standard Form (SF) 25A. Please note that no substitute forms will be accepted. Payment Bonds are due no later than 10 calendar days after award

Norwood
Due Oct 27, 2026View bid
CanadaBuysCloses in 19 days

GWD - Install Solar Microgrid, 14 Wing Greenwood, NS

DEFENCE CONSTRUCTION CANADA (DCC) – Project No. GW252302_86354 – GWD - Install Solar Microgrid, 14 Wing Greenwood, NS The work includes, but is not necessarily limited to, the supply of labour, material, supervision, and equipment necessary for construction/ installation of a 300kW solar photovoltaic (PV) array, Bess, diesel generators, electrical building, Grid controller, 1500vdc combiners, 300kw inverters, 600 V AC combiner panel, and transformers. NOTE: There is no site visit scheduled for this opportunity. The estimated cost for this opportunity is in the range of $15,797,100.00 The Work must reach Substantial Completion no later than 567 calendar days after notification of contract award and must be completed no later than 28 calendar days after the date of Substantial Completion. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). The Contractor must, at all times during the performance of the Contract, hold a valid Designated Organization Screening (DOS), issued by the Contract Security Program (CSP) within Public Services and Procurement Canada (PSPC).  Details concerning the Security Requirements for this project are identified in Amendment No.1 to the tender documents.  Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement.  Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified. Please note that the preliminary tender results for this project will be available on MERX. Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activityBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Bedford, Nova Scotia
Due Oct 27, 2026View bid
CanadaBuysCloses in 19 days

APN_UPGRADE ACCOMODATIONS BUILDINGS A-147 & A-149, CFB BORDEN, ON

Advance Procurement Notice Upgrade Accomodations Buildings A-147 & A-149 CFB Borden, ON (with Security Requirements) Purpose of this Advance Procurement Notice This is not a bid solicitation nor a request for proposals. In the context of the major investments announced by the Government and to foster a proactive partnership with industry, DCC is issuing this Advance Procurement Notice (APN) to inform contractors of an upcoming contract opportunity. The purpose of this APN is to allow contractors to assess their capacity and interest in participating, and to prepare adequately for the potential solicitation process, notably by initiating any necessary steps. This is a preliminary notice regarding a potential contract, which includes security requirements. The purpose of this APN is to allow interested contractors to initiate, if required, the sponsorship process to obtain the necessary clearances or security clearances (if applicable). Please note that this project may include Indigenous businesses participation component in accordance with the Procurement Strategy for Indigenous Business (PSIB). Please note that there is no guarantee that this contract will proceed or that security clearances will be granted within the anticipated timelines or at all as part of the sponsorship process. Description of the Project and Services It is anticipated that the following solicitation will proceed as noted in the table below. This is conditional on the contract receiving approval to proceed from DND. APN Number: 86114 Approximate Estimate: $22M Anticipated Posting: November 2026 Description: Work of this contract comprises of the renovation of both building A-147 and A-149 at CFB Borden. Both existing accommodations are sites of extensive building upgrades that are primarily focused on addressing life-safety, building envelope upgrades, electrical, mechanical upgrades and roofing replacements. Contract Award and Anticipated Security Requirements To be eligible for contract award, a bidder will be required to, among other things, actively hold or obtain all required security clearance(s) prior to the date of the award, as further detailed in the solicitation documents. The anticipated security clearance level for this contract is Designated Organization Screening (DOS). Industrial Security Program Sponsorship Defence Construction Canada (DCC) is providing contractors early access to the security clearance application process through sponsorship under its Industrial Security Program (ISP). Accordingly, contractors that intend to submit a bid for this project and that do not actively hold the above identified security clearance(s) should begin forthwith the security clearance application process by applying through DCC’s ISP. Under this program, DCC may, at its entire discretion, provide preliminary assistance to all the potential bidders with their respective security clearance sponsorship process. To begin the security clearance sponsorship process, please submit a sponsorship request application to DCC by following the steps identified on DCC’s website at: https://www.dcc-cdc.gc.ca/industry/security-requirements. In their sponsorship request application to DCC, consultants or contractors are asked to quote the following information, among other things: Advance Procurement Notice (APN) number: 86114 Level of clearance requested to be sponsored for. Sponsorship Process Upon receipt, DCC will review the sponsorship request application and will communicate directly with the consultants or contractors to provide assistance for the completion of the sponsorship request packages. Once DCC has determined, at its entire discretion, that a consultant or contractor: has started the sponsorship process prior to the solicitation (Contract number listed on their request for sponsorship) being advertised on MERX, has met all the material requirements of the sponsorship request package, and has submitted a proposal or a bid DCC will  send the documents to the Public Services and Procurement Canada’s (PSPC) Contract Security Program (CSP). Following receipt of the sponsorship request package, the CSP will communicate directly with the proponent or bidder regarding any further steps or actions to be undertaken or the status of the sponsorship request package processing. At such time, the proponent or bidder will need to promptly cooperate with CSP  to ensure that the process is completed as soon as possible. Questions Any questions pertaining to the sponsoring process through the ISP can be addressed to: Telephone Number: (613) 998-8974; or Email address: ISP.Sponsorship@dcc-cdc.gc.ca Any questions relating to this Advance Procurement Notice can be addressed to: Julius Mensah Coordinator, Contract Services Defence Construction Canada 249 535 0793 julius.mensah@dcc-cdc.gc.ca Disclaimer DCC is only providing assistance, at its entire discretion, for the above stated sponsorship process and does not provide any representations or guarantees that a sponsorship request package or a security clearance application forwarded by DCC to the CSP will be successful or result in the granting of the requested security clearance(s) by the CSP. At all times, the processing of a sponsorship request package or a security clearance application is subject to the respective terms, conditions, and timelines of DCC’s ISP sponsorship process and the CSP security clearance granting process. By applying to either of the aforementioned processes, the proponent or bidder agrees to bear any fees and risks associated with: (i) the completeness or accuracy, or lack thereof, of its application or related documents submitted under or in connection with either said processes, and (ii) the timeliness, or lack thereof, of any processing or granting of security clearance(s) under or in connection with either said processes. Notwithstanding anything else stated above, DCC shall in no event be liable to the bidder or proponent for any direct, indirect, incidental, special, consequential, punitive or exemplary damages arising out or in connection with the above stated sponsorship process.  Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Kingston, Ontario
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

J061--TRIENNIAL ELECTRICAL MAINTENANCE FY26 AMENDMENT #3 Q&A RESPONSE, SCOPE UPDATE, DRAWINGS AND PANEL LISTS NEW DEADLINE: 10/27/26 POP START DATE: 12/01/2026

This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with format in FAR Subpart 13; simplified acquisition procedures apply. VA will conduct the procurement according to a combination of FAR Part 12, Acquisition of Commercial Items and Part 13, Simplified Acquisition Procedures as supplemented with additional information included in this notice. This Amendment serves to extend the deadline for solicitation submission. The solicitation number is 36C25626Q1011 and is issued as a Request for Quotation (RFQ). The Southeast Louisiana Veterans Healthcare System (SLVHCS) requires triennial system testing of the entire electrical distribution system in accordance with VHA Directive 1028. The areas include the New Orleans VA Medical Center at 2400 Canal St, New Orleans, LA 70119, the St. John VA Clinic (CBOC) and the 4004 West Airline Highway Reserve, LA 70084 5712,. All work shall be performed to ensure a clean, safe, functional, and compliant environment for Veterans, visitors, and staff. Notice of Total Service-Disabled Veteran Owned Small Business Set-Aside applies to all items in this solicitation. Interested persons may submit quotes, and all eligible quotes must be received prior to the response date listed on FBO to be considered by the Government. This solicitation is 100% SET-ASIDE FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS. The NAICS code is 238210 (Electrical Contractor and other Wiring Installation Contractors) and the size standard is $19 million. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026 01 (03/13/2026). Only emailed requests received directly from the requester will be accepted. RESPONSES ARE DUE, October 27th, 2026, by 13:00 p.m. Central Time (CST). Quotes are due electronically to Christopher.rossi2@va.gov no later than the response date listed on FBO. Only electronic quotes will be considered. Phone calls will not be accepted, all requests for drawings and panel lists must be submitted via email to Christopher.rossi2@va.gov by 13:00 p.m. Central Daylight Time (CDT) NLT 09 October, 2026. No further site visits will be scheduled. Additional questions may be submitted to Christopher.rossi2@va.gov NLT 10/09/26, 13:00 CDT. Point of contact for this solicitation is Christopher Rossi at Christopher.rossi2@va.gov. All Inquires must be submitted electronically. -Addendum to FAR 52.212-1 Instructions to Offerors.

New OrleansElectrical
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Solicitation - Residential Reentry Services and Home Confinement Services within city limits of Pawtucket, Rhode Island.

Residential Reentry Center (RRC) services and Home Confinement (HC) services for male and female offenders located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. Deadline for submitting questions about the solicitation will be 28 September 2026 @ 2pm. Question and Answers will posted on SAM.gov.

Pawtucket
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Solicitation - Residential Reentry Services and Home Confinement Services within city limits of Pawtucket, Rhode Island.

Request for Proposal (RFP) - 15BRRC26R00000009 Residential Reentry Center (RRC) services and Home Confinement (HC) services for male and female offenders located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. The Federal Bureau of Prisons is seeking concerns having the ability for providing Residential Reentry Center (RRC) services (in-house RRC beds) and Home Confinement services (home confinement placements) for male and female Federal offenders held under the authority of United States Statutes which are located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. Both the RRC services for in-house RRC beds and the Home Confinement services for home confinement placements shall be in accordance with the Federal Bureau of Prisons Statement of Work (SOW) entitled, “Residential Reentry Center, March, 2022”. Home Confinement services (for home confinement placements) are specifically defined in chapter 10, programs, of the SOW. Additional requirements for these services are referenced throughout the SOW as well. This will be a Firm-Fixed Price/IDIQ contract for services with a one-year base period, and four one-year options periods. The RRC In-House requirement will consist of a guaranteed minimum 8 beds (8 males and 0 females) and an estimated maximum 20 beds facility in which 18 beds will be designated for males and 2 beds designated for females. The Home Confinement requirement will consist of a guaranteed minimum 3 placements and an estimated maximum 8 placements to include both male and female. It is the intent of the Government to award both line items (RRC in-house beds and home confinement placements) to a single provider, as these services are interconnected and rely upon each other to ensure adequate programming and case management of offenders. The Government reserves the right to potentially make an award which is deemed to be in the best interest of the Government. 15BRRC26R00000009 will be available on or about August 28, 2026, and it will be distributed solely through the General Services Administration's Federal Business Opportunities website at https://SAM.gov. Hard copies of the solicitation will not be available. The site provides downloading instructions. Future information about this acquisition will also be distributed through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. The estimated closing date of this solicitation (RFP) will be after 60 days around October 27, 2026. All responsible sources may submit a proposal which will be considered by this agency. No collect calls will be accepted. No telephone request or written requests for the solicitation will be accepted. Deadline for submitting questions about the solicitation will be 28 September 2026 @ 2pm. Question and Answers will posted on SAM.gov.

Pawtucket
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Solicitation - Residential Reentry Services and Home Confinement Services within city limits of Pawtucket, Rhode Island.

Request for Proposal (RFP) - 15BRRC26R00000009 Residential Reentry Center (RRC) services and Home Confinement (HC) services for male and female offenders located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. The Federal Bureau of Prisons is seeking concerns having the ability for providing Residential Reentry Center (RRC) services (in-house RRC beds) and Home Confinement services (home confinement placements) for male and female Federal offenders held under the authority of United States Statutes which are located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. Both the RRC services for in-house RRC beds and the Home Confinement services for home confinement placements shall be in accordance with the Federal Bureau of Prisons Statement of Work (SOW) entitled, “Residential Reentry Center, March, 2022”. Home Confinement services (for home confinement placements) are specifically defined in chapter 10, programs, of the SOW. Additional requirements for these services are referenced throughout the SOW as well. This will be a Firm-Fixed Price/IDIQ contract for services with a one-year base period, and four one-year options periods. The RRC In-House requirement will consist of a guaranteed minimum 8 beds (8 males and 0 females) and an estimated maximum 20 beds facility in which 18 beds will be designated for males and 2 beds designated for females. The Home Confinement requirement will consist of a guaranteed minimum 3 placements and an estimated maximum 8 placements to include both male and female. It is the intent of the Government to award both line items (RRC in-house beds and home confinement placements) to a single provider, as these services are interconnected and rely upon each other to ensure adequate programming and case management of offenders. The Government reserves the right to potentially make an award which is deemed to be in the best interest of the Government. 15BRRC26R00000009 will be available on or about August 28, 2026, and it will be distributed solely through the General Services Administration's Federal Business Opportunities website at https://SAM.gov. Hard copies of the solicitation will not be available. The site provides downloading instructions. Future information about this acquisition will also be distributed through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. The estimated closing date of this solicitation (RFP) will be after 60 days around October 27, 2026. All responsible sources may submit a proposal which will be considered by this agency. No collect calls will be accepted. No telephone request or written requests for the solicitation will be accepted.

Pawtucket
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Solicitation - Residential Reentry Services and Home Confinement Services within city limits of Pawtucket, Rhode Island.

Request for Proposal (RFP) - 15BRRC26R00000009 Residential Reentry Center (RRC) services and Home Confinement (HC) services for male and female offenders located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. The Federal Bureau of Prisons is seeking concerns having the ability for providing Residential Reentry Center (RRC) services (in-house RRC beds) and Home Confinement services (home confinement placements) for male and female Federal offenders held under the authority of United States Statutes which are located within city limits of Pawtucket, Rhode Island. Home Confinement radius is within 100 miles of the RRC facility. Both the RRC services for in-house RRC beds and the Home Confinement services for home confinement placements shall be in accordance with the Federal Bureau of Prisons Statement of Work (SOW) entitled, “Residential Reentry Center, March, 2022”. Home Confinement services (for home confinement placements) are specifically defined in chapter 10, programs, of the SOW. Additional requirements for these services are referenced throughout the SOW as well. This will be a Firm-Fixed Price/IDIQ contract for services with a one-year base period, and four one-year options periods. The RRC In-House requirement will consist of a guaranteed minimum 8 beds (8 males and 0 females) and an estimated maximum 20 beds facility in which 18 beds will be designated for males and 2 beds designated for females. The Home Confinement requirement will consist of a guaranteed minimum 3 placements and an estimated maximum 8 placements to include both male and female. It is the intent of the Government to award both line items (RRC in-house beds and home confinement placements) to a single provider, as these services are interconnected and rely upon each other to ensure adequate programming and case management of offenders. The Government reserves the right to potentially make an award which is deemed to be in the best interest of the Government. 15BRRC26R00000009 will be available on or about August 28, 2026, and it will be distributed solely through the General Services Administration's Federal Business Opportunities website at https://SAM.gov. Hard copies of the solicitation will not be available. The site provides downloading instructions. Future information about this acquisition will also be distributed through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. The estimated closing date of this solicitation (RFP) will be after 60 days around October 27, 2026. All responsible sources may submit a proposal which will be considered by this agency. No collect calls will be accepted. No telephone request or written requests for the solicitation will be accepted.

Pawtucket
Due Oct 27, 2026View bid
CanadaBuysCloses in 19 days

APN_Construct Warehouse (CADSS/MAJAID), Trenton ON

Advance Procurement Notice Construct CADSS MAJAID Facility (Design Bid Build) Trenton, Ontario (with Security Requirements) Purpose of this Advance Procurement Notice This is not a bid solicitation nor a request for proposals. In the context of the major investments announced by the Government and to foster a proactive partnership with industry, DCC is issuing this Advance Procurement Notice (APN) to inform contractors of an upcoming contract opportunity at Canadian Forces Base (CFB) Trenton, ON. The purpose of this APN is to allow contractors to assess their capacity and interest in participating, and to prepare adequately for the potential solicitation process, notably by initiating any necessary steps. This is a preliminary notice regarding a potential contract, which includes security requirements. The purpose of this APN is to allow interested contractors to initiate, if required, the sponsorship process to obtain the necessary clearances or security clearances (if applicable). Please note that there is no guarantee that this contract will proceed or that security clearances will be granted within the anticipated timelines or at all as part of the sponsorship process. Please note that this project may include Indigenous businesses participation component in accordance with the Procurement Strategy for Indigenous Business (PSIB). Description of the Project and Services It is anticipated that the following 2-Step (Step 1: Request for Expression of Interest, Step 2: Tender Phase) solicitation will proceed as noted below. This is conditional on the contract receiving approval to proceed from DND. APN Number: TRS18081_73944 Approximate Estimate: $11M - $13M Anticipated Posting Step 1: Fall 2026 Anticipated Posting Step 2: Fall 2026 Description: Work of this contract comprises general contracting services and the supply and installation of all materials and labour required to construct a warehouse facility. The proposed facility will provide warehouse space for the Combat Aerial Delivery Support Section/Major Air Disaster (CADSS/MAJAID) Unit. The facility will support unit operations, including parachute inspection, drying, preparation, and packing activities; a dedicated carpentry shop; storage of operational material and equipment; and administrative office space. The facility will also accommodate material handling and warehouse operations, including the use of forklifts and other machinery within the building. The total estimated gross area of the project 1,554 m2. Contract Award and Anticipated Security Requirements To be eligible for contract award, a bidder will be required to, among other things, actively hold or obtain all required security clearance(s) prior to the date of the award, as further detailed in the solicitation documents. The anticipated security clearance level for this contract is Designated Organization Screening (DOS). Industrial Security Program Sponsorship Defence Construction Canada (DCC) is providing contractors early access to the security clearance application process through sponsorship under its Industrial Security Program (ISP). Accordingly, contractors that intend to submit a bid for this project and that do not actively hold the above identified security clearance(s) should begin forthwith the security clearance application process by applying through DCC’s ISP. Under this program, DCC may, at its entire discretion, provide preliminary assistance to all the potential bidders with their respective security clearance sponsorship process. To begin the security clearance sponsorship process, please submit a sponsorship request application to DCC by following the steps identified on DCC’s website at: https://www.dcc-cdc.gc.ca/industry/security-requirements. In their sponsorship request application to DCC, consultants or contractors are asked to quote the following information, among other things: Advance Procurement Notice (APN) number (TRS18081_73944); Level of clearance requested to be sponsored for. Sponsorship Process Upon receipt, DCC will review the sponsorship request application and will communicate directly with the consultants or contractors to provide assistance for the completion of the sponsorship request packages. Once DCC has determined, at its entire discretion, that a consultant or contractor: Have submitted a response to the Step 1: RFEOI, have submitted a Sponsorship application prior to the date of publication of the Step 2: Tender Phase, meet all material requirements of the sponsorship application package by the closing date of the Step 2: Tender Phase, and Have submitted a tender to the Step 2: Tender Phase. DCC will send the documents to the Public Services and Procurement Canada’s (PSPC) Contract Security Program (CSP). Note – Contractors or Consultants that do not submit a tender or proposal will not be able to attain clearance through this sponsorship process. Following receipt of the sponsorship request package, the CSP will communicate directly with the proponent or bidder regarding any further steps or actions to be undertaken or the status of the sponsorship request package processing. At such time, the proponent or bidder will need to promptly cooperate with CSP to ensure that the process is completed as soon as possible. Questions Any questions pertaining to the sponsoring process through the ISP can be addressed to: Telephone Number: (613) 998-8974; or Email address: ISP.Sponsorship@dcc-cdc.gc.ca Any questions relating to this Advance Procurement Notice can be addressed to: Steven Foster Team Leader, Contract Services Defence Construction Canada 613-813-4716 steven.foster@dcc-cdc.gc.ca Disclaimer DCC is only providing assistance, at its entire discretion, for the above stated sponsorship process and does not provide any representations or guarantees that a sponsorship request package or a security clearance application forwarded by DCC to the CSP will be successful or result in the granting of the requested security clearance(s) by the CSP. At all times, the processing of a sponsorship request package or a security clearance application is subject to the respective terms, conditions, and timelines of DCC’s ISP sponsorship process and the CSP security clearance granting process. By applying to either of the aforementioned processes, the proponent or bidder agrees to bear any fees and risks associated with: (i) the completeness or accuracy, or lack thereof, of its application or related documents submitted under or in connection with either said processes, and (ii) the timeliness, or lack thereof, of any processing or granting of security clearance(s) under or in connection with either said processes. Notwithstanding anything else stated above, DCC shall in no event be liable to the bidder or proponent for any direct, indirect, incidental, special, consequential, punitive or exemplary damages arising out or in connection with the above stated sponsorship process.  Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Kingston, Ontario
Due Oct 27, 2026View bid
CanadaBuysCloses in 19 days

Advance Procurement Notice - Independent Certifier for Alexandra Bridge Replacement Project

His Majesty the King in right of Canada, as represented by the Minister of Public Works and Government Services Canada and operating as Public Service Procurement Canada (“PSPC” or “Canada”), is contemplating a procurement process for the provision of Independent Certifier ("IC") services for the Alexandra Bridge Replacement Project (the “Project”). The purpose of this Advance Procurement Notice ("APN") is to provide interested parties with preliminary information regarding the requirement and the anticipated procurement process for the provision of IC services for the Project (the "Procurement Process"). This APN is also intended to promote early market awareness and engagement with organizations that possess the qualifications and experience required to deliver IC services for the Project. This APN is not part of the Procurement Process, and does not constitute a solicitation, request for proposal, or commitment by Canada to proceed with the Procurement Process. No agreement or contract will be entered into based on this APN. Canada reserves the right to amend, cancel, suspend, or modify the contemplated procurement strategy and requirements at any time.

Gatineau, Quebec
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies

See attached solicitation and supporting documents

El Paso
Due Oct 27, 2026View bid
CanadaBuysCloses in 19 days

Cooling Tower Replacement at the London Research and Development Centre

Invitation to tender CSC-2627-506 Cooling Tower Replacement at the London Research and Development Centre Tenders for the project indicated above, will be accepted at the following address, up to the tender closing date and time indicated below: aafc.wscprocurement-csoapprovisionnement.aac@agr.gc.ca Scope of Work: Agriculture and Agri-Food Canada (AAFC) requires the services of a General Contractor to supply and install a cooling tower at the London Research and Development Centre. Optional Site Visit: There will be a site visit on October 15, 2026 at 10:00AM (Eastern Time). Interested bidders are to meet at the London Research and Development Centre located at 1391 Sandford Street, London, Ontario. Bidders who attend the site visit must sign the attendance sheet. Bidders must arrive at least 10 minutes before the start of the visit. Attendance to this visit is NOT MANDATORY, however bidders that do not attend will not be given an alternative appointment, and will not be precluded from submitting an offer. Tender Period Closing Date and Time: October 27, 2026 at 2:00 pm (Central Time). Information requests and inquiries related to this tender process are to be directed, in writing, ONLY to the AAFC Contract Officer identified below. Bidders who contact anyone other than the AAFC Contract Officer to obtain such information during the solicitation period may, for that reason alone, be disqualified. It is MANDATORY for the Firms intending to submit tenders on this project to obtain the related specifications, plans and drawings, and all other tender documents through the CanadaBuys service provider’s platform. Addenda, when issued, will be available from the CanadaBuys service provider platform. AAFC reserves the right to accept any Proposal in whole or in part, without prior negotiation and reject any or all Proposals received. AAFC Contract Officer: Desta Kissack, Senior Contracting Specialist Agriculture and Agri-Food Canada Telephone: 204-583-8127 E-mail address: desta.kissack@agr.gc.ca

Ontario
Due Oct 27, 2026View bid
SAM.govCloses in 19 days

J--E21 PRCA HVAC REPLACEMENT

Planet Ranch Conservation Area HVAC Replacement Amendment 01 is being issued to update the Clauses to include FAR Clause 52.228-13 Alternative Payment Protections and to update Section 7 of the Statement of Work. See revised documents.

United StatesPlumbing · HVAC Mechanical
Due Oct 27, 2026View bid