Skip to content

Bid Board

1,059 live construction bids & tenders

Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.

SAM.govCloses in 15 days

John Day Dam Powerhouse HVAC Upgrades

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1–14 located in Sherman County, Oregon, and Units 15–16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800?171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. Systems must be integrated into a new automated digital HVAC control system. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. HVAC upgrades include new intake and exhaust ducting to prevent smoke propagation through the building in the event of fire, and fire protection measures at all penetrations. HVAC and the building fire protection systems must be fully integrated, replacing all existing pneumatic controls with an integrated digital control system which is capable of functioning to selectively shut down the HVAC to isolate sectors in the event of a fire or smoke event. The work includes mechanical and controls provisions for free cooling using passive outside air during cold nights and modifications to existing intakes, louvers, and penetrations to support smoke ventilation. Localized HVAC units such as mini-splits will be installed for specific spaces, with new electrical supplies, piping, insulation, penetrations, and data reporting to the central HVAC control system. Work will be performed in an active, operational Powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including areas below headwater with nuisance water intrusion risks. Certain pumps must remain operational throughout construction, presenting noise and safety hazards that must be managed. The existing fire suppression system must remain active during construction and be recommissioned upon project completion. Work includes ductwork installation and protection of floor penetrations in close proximity to operational high-voltage electrical busbars, emphasizing strict delineation and safety control of work areas. New systems to be installed must not use refrigerants subject to future refrigerant phase-out schedules (no refrigerant subject to phase-out at any point in the future may be used). Work includes extensive structural penetrations and modifications to support permanent equipment installation including piping, ductwork and new condensing systems. Asbestos abatement and lead mitigation may be required. The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $25M and $100M. This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. This synopsis is not a request for quotes (RFQ), proposals (RFP), or in an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is mid-August 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications and drawings will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov

RufusPlumbing · HVAC Mechanical
Due Aug 20, 2026View bid
SAM.govCloses in 15 days

36 MXG Corrosion Control Repair and Paint Services

I. DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA524026Q0017 is issued as a request for quotation (RFQ) for Corrosion Control Repair and Paint Services on Guam. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. II. CONTRACT LINE-ITEM NUMBERS (CLINS) are firm-fixed price (FFP) as shown in the attached SF1449 titled Solicitation - FA524026Q0017 and Attachment 2 - Price List. III. DESCRIPTION OF SERVICE The primary objective of this contract is to provide comprehensive corrosion control services for AGE and MUNS Trailers. To achieve this, the contractor shall perform complete corrosion removal, surface preparation, and coating applications in strict accordance with the applicable Technical Orders. Furthermore, the contractor shall replace corroded hardware as specified in the applicable Technical Order or as directed by the COR, provided the material cost for replacement hardware on any single asset does not exceed the Micro-Purchase Threshold (MPT) defined in the Federal Acquisition Regulation (FAR). The contractor shall conduct repairs according to the repair level identified during the initial joint inspection or subsequent repair process. Finally, the contractor shall adhere to all established equipment pickup and return timeframes to ensure minimal disruption to Government mission operations. The contractor shall not perform any out-of-scope work; if the COR requests work outside the scope of this contract, the contractor must immediately notify the Contracting Officer (KO) before proceeding. The contractor shall provide a skilled labor force capable of performing comprehensive corrosion control, including metal repair (welding and fabrication), fiberglass rework, plastic structure restoration, composite repairs, and painting. Personnel shall possess and maintain all required qualifications and certifications in accordance with paragraph 6.5 of the PWS. The contractor shall utilize sufficient surface preparation equipment and methods to remove existing coatings and ensure optimal adhesion and bonding of new paint systems, all while performing corrosion removal without compromising the structural integrity of the assets. All equipment restoration, painting, and coating applications shall be performed in accordance with applicable technical data and Occupational Safety and Health Administration (OSHA) regulations. The contractor shall ensure the safety and accountability of all personnel and shall provide all required personal protective equipment. Required service details will be defined at the Task Order level. IV. PLACE AND PERIOD OF PERFORMANCE Place of Performance: The work to be performed under this contract will be performed at the contractor’s facility on Guam, however exceptions for another location on Guam may apply which will be specified at the task order level. Period of Performance: The ordering period for this contract is five (5) years. The period of performance for any order shall not extend more than six (6) months beyond the end of the ordering year in which it is placed; the established rates for that ordering year shall apply to that order. In no event shall any period of performance extend more than six (6) months beyond the expiration of the final ordering period; resulting in a maximum contract lifecycle of five (5) years and six (6) months. The ordering period concludes at the end of five (5) years or when the cumulative value of all issued orders reaches the IDIQ ceiling, whichever comes first. V. SOLICITATION PROVISIONS AND CONTRACT CLAUSES The full list of provisions and clauses applicable to this acquisition are included in the attached SF1449 titled Solicitation - FA524026Q0017. VI. QUOTE DUE DATE/TIME: To be considered for award, quotes must be emailed to: gary.scullin.1@us.af.mil, thomas.houle.4@us.af.mil and elena.gifford.1@us.af.mil no later than 11:00 A.M. Chamorro Standard Time (ChST) on 21 August 2026. (Note: .zip files are not an acceptable format for the Air Force Network. It is the vendor’s responsibility to confirm receipt of quote.) VII. OPTIONAL SITE VISIT An optional site visit for interested Offerors will be conducted on 11 August 2026. Please see Attachment 4 Site Visit Details and Instructions.

Yigo
Due Aug 21, 2026View bid
SAM.govCloses in 15 days

36 MXG Corrosion Control Repair and Paint Services

I. DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA524026Q0017 is issued as a request for quotation (RFQ) for Corrosion Control Repair and Paint Services on Guam. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. II. CONTRACT LINE-ITEM NUMBERS (CLINS) are firm-fixed price (FFP) as shown in the attached SF1449 titled Solicitation - FA524026Q0017 and Attachment 2 - Price List. III. DESCRIPTION OF SERVICE The primary objective of this contract is to provide comprehensive corrosion control services for AGE and MUNS Trailers. To achieve this, the contractor shall perform complete corrosion removal, surface preparation, and coating applications in strict accordance with the applicable Technical Orders. Furthermore, the contractor shall replace corroded hardware as specified in the applicable Technical Order or as directed by the COR, provided the material cost for replacement hardware on any single asset does not exceed the Micro-Purchase Threshold (MPT) defined in the Federal Acquisition Regulation (FAR). The contractor shall conduct repairs according to the repair level identified during the initial joint inspection or subsequent repair process. Finally, the contractor shall adhere to all established equipment pickup and return timeframes to ensure minimal disruption to Government mission operations. The contractor shall not perform any out-of-scope work; if the COR requests work outside the scope of this contract, the contractor must immediately notify the Contracting Officer (KO) before proceeding. The contractor shall provide a skilled labor force capable of performing comprehensive corrosion control, including metal repair (welding and fabrication), fiberglass rework, plastic structure restoration, composite repairs, and painting. Personnel shall possess and maintain all required qualifications and certifications in accordance with paragraph 6.5 of the PWS. The contractor shall utilize sufficient surface preparation equipment and methods to remove existing coatings and ensure optimal adhesion and bonding of new paint systems, all while performing corrosion removal without compromising the structural integrity of the assets. All equipment restoration, painting, and coating applications shall be performed in accordance with applicable technical data and Occupational Safety and Health Administration (OSHA) regulations. The contractor shall ensure the safety and accountability of all personnel and shall provide all required personal protective equipment. Required service details will be defined at the Task Order level. IV. PLACE AND PERIOD OF PERFORMANCE Place of Performance: The work to be performed under this contract will be performed at the contractor’s facility on Guam, however exceptions for another location on Guam may apply which will be specified at the task order level. Period of Performance: The ordering period for this contract is five (5) years. The period of performance for any order shall not extend more than six (6) months beyond the end of the ordering year in which it is placed; the established rates for that ordering year shall apply to that order. In no event shall any period of performance extend more than six (6) months beyond the expiration of the final ordering period; resulting in a maximum contract lifecycle of five (5) years and six (6) months. The ordering period concludes at the end of five (5) years or when the cumulative value of all issued orders reaches the IDIQ ceiling, whichever comes first. V. SOLICITATION PROVISIONS AND CONTRACT CLAUSES The full list of provisions and clauses applicable to this acquisition are included in the attached SF1449 titled Solicitation - FA524026Q0017. VI. QUOTE DUE DATE/TIME: To be considered for award, quotes must be emailed to: gary.scullin.1@us.af.mil, thomas.houle.4@us.af.mil and elena.gifford.1@us.af.mil no later than 11:00 A.M. Chamorro Standard Time (ChST) on 21 August 2026. (Note: .zip files are not an acceptable format for the Air Force Network. It is the vendor’s responsibility to confirm receipt of quote.) VII. OPTIONAL SITE VISIT An optional site visit for interested Offerors will be conducted on 11 August 2026. Please see Attachment 4 Site Visit Details and Instructions. VIII. AMENDMENTS 7/28/26: Amendment 0001 - The purpose of this amendment is to update Attachment 2 - Price List due to a technical permissions access issue. Reference Attachment 2 - Price List - Corrosion Control_23Julv2.

Yigo
Due Aug 21, 2026View bid
Contracts Finder (UK)Closes in 15 days

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Scope of Work To undertake, removal, replacement, re-decoration and remediation of external roofing sheets to a multitude of buildings across an MOD establishment. This will include the provision of specialist contractors and access equipment.

Thetford, England£400,000 (est.)
Due Aug 21, 2026View bid
Contracts Finder (UK)Closes in 15 days

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 8 - A CAMP Roof Winterisation)

Scope of Work To undertake, removal, replacement, re-decoration and remediation of external roofing sheets to a multitude of buildings across an MOD establishment. This will include the provision of specialist contractors and access equipment.

Thetford, England£400,000 (est.)
Due Aug 21, 2026View bid
Contracts Finder (UK)Closes in 15 days

26-E-STAN06-FOC08-INTERFLEX- West Tofts Camp-INTERFLEX Remediation (Work Package 5 - Roof Winterisation)

Scope of Work To undertake, removal, replacement, re-decoration and remediation of external roofing sheets to a multitude of buildings across an MOD establishment. This will include the provision of specialist contractors and access equipment.

Thetford, England£400,000 (est.)
Due Aug 21, 2026View bid
SAM.govCloses in 15 days

B145 DCMA Office Space Renovation

The notice constitutes a Request for Quotation (RFQ), Solicitation W50S8A-26-Q-A035, to renovate office space in B145 at Pease Air National Guard Base (PEASE ANGB) in Newington, NH. The Government seeks to award a single firm fixed price contract for services, non-person, to provide all plant, labor, transportation, materials, tools, equipment, and supervisors as needed. The anticipated contract duration shall be approximately 90 days. Please refer to the attached specifications and drawings included in this solicitation. Also be sure to review the attached SF1442 for a complete listing of the applicable provisions and clauses. Please note that the Government is setting this requirement as a total 100% small business set-aside under the North American Industrial Classification System (NAICS) 236210 (Industrial Building Construction) with a size standard of $45.0M. The associated PSC code is Z2AA. Interested parties shall provide the quotes to the Government by the closing date and time specified in this solicitation and in box 13 of the SF1442. All quotes shall be emailed to the points of contact listed in this posting. This solicitation also constitutes a notice of site visit which the Government will hold on 5 August 2026 at 10:00AM (EST). Please review 00 21 00 for instructions and submission requirements for site access before the event. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. All requests for information (RFIs) are due no later than the date specified in para 4.3 of section 00 21 00 of the SF 1442. NOTE: Funds are not presently available for this requirement IAW FAR 52.232-18. Funding shall be made available at the time of award.

Newington
Due Aug 21, 2026View bid
NYC City RecordCloses in 15 days

Bid Extension: SMD - Requirement Contract for Installation of V/C Floor Tile in Apartments- Development Name, Located in Brooklyn Neighborhood (BK04) and (BK05), Brooklyn.

Requirement Contract for Installation of V/C Floor Tile in Apartments- Development Name, Located in Brooklyn Neighborhood (BK04) and (BK05), Brooklyn. No Bid Security Required. NYCHA intends to separately solicit and award a series of Ten (10) requirement contracts for Installation V/C Floor Tile in Apartments-Development Specific pursuant to RFQ#s: 523162- Brownsville Houses, 523163- Langston Hughes Houses, 523164-Seth Low/Glenmore Houses,  523165- Tilden Houses, 523166- Van Dyke Houses, 523167- Woodson/ Van Dyke II Houses, 523168-Brevoort Houses, 523169- Kingsborough Houses, 523170- Marcus Garvey/Rev Brown Houses and 523171- Howard Houses (or this Bid Series). Contract Term: The Term of this contract shall be for a period of three (3) years from the award date established on NYCHAs Blanket Purchase Order or the issuance of the Notice to Proceed Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this contract with up to two (2) one-year renewal periods. Limiting Award Provision: NYCHA has determined that it is in the best interest of NYCHA to award only one (1) of the Requirement contracts in this Bid Series to the lowest responsive, responsible individual Contractor, subject to the award limiting language (Step 1). Subject to NYCHAs responsive and responsibility determinations of the Bidder and the award limiting language set forth herein, to the extent there are other Requirement contracts in this Bid Series that are not yet awarded after Step 1, NYCHA, in its sole and absolute discretion, may award up to One (1) additional contract(s) to a Contractor or Contractors that has, pursuant to Step 1, been awarded the maximum number of contracts in this Bid Series (Step 2). Solicitations Subjected to Davis Bacon Prevailing Wage Schedule: Labor Law 220i Registration Certificates and Certification Bidders are hereby notified that effective as of December 30, 2024, as a precondition to submitting its Bid, the Bidder and each subcontractor identified by the Bidder in its Bid, must be registered with the New York State Department of Labor (NY DOL) pursuant to Article 8, Section 220-i of the New York State Labor Law (LL 220-i). Instructions on how to register can be found at https://dol.ny.gov/contractor-and-subcontractor-landing. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule. Pre-qualification: To be considered eligible for the award, a bidder must pre-qualify as an 'Approved Supplier via NYCHA-Tile Pre-Qualification List (PQL) and appear on the active approved vendor list https://www.nyc.gov/site/nycha/business/nycha-pql.page Section 3 REO & OEO Plans: Section 3 REO & OEO Plans must be submitted via eComply, https://nycha.ecomply.us/ and no later than Bid Submission Deadline.   For eComply log-in assistance contact eComply Tech support: support@ecomplysolutions.com For Section 3 submissions assistance contact NYCHAs SMP Vendor Diversity team: eComply.support@nycha.nyc.gov   Reminder: DO NOT include Section 3 documentation within bid submission via iSupplier. Pre-Bid Conference: NYCHA hosted Pre-Bid Conferences to launch the rollout of the solicitation of the NYCHA Tile Program-Phase III/ Installation of Vinyl Composition Floor Tile in Apartments bid series. * Friday, 05/29/2026*- Bronx Property Management & Bronx Developments * Friday, 06/05/2026*- Brooklyn Property Management & Brooklyn Developments * Wednesday, 06/17/2026*- Manhattan Property Management & Manhattan Developments and * Wednesday, 06/24/2026*-Queens& Staten Island Property Management & Queens and Staten Island Developments.  * The information previously presented (*) is applicable here, hence a Pre-Bid Conference will not be hosted for this solicitation series. * Questions pertaining to this Solicitation Series-RFQ#523162-523171 and submitted via the NYCHA Cyclical Procurement mailbox at: cyclical.procurement@nycha.nyc.gov (include RFQ number in subject field) prior to Question Deadline will be accepted.   RFQ Question Submission Deadline: Wednesday, 07/01/2026 at 2:00PM Question and Answer Release Date: Wednesday, 07/08/2026 at 2:00PM In addition to the documents attached below, bidders are directed to review the Special Notices and Conditions, Instructions to Bidders, and General Conditions prior to submitting a bid.  To access these documents, click on the 'Contract Terms' tab above, and then 'Preview Contract Terms,' to download a PDF version. Please note that in the event NYCHA receives no responses in connection with this RFQ by the original bid submission deadline, the bid submission deadline shall be extended automatically for seven (7) calendar days.  The foregoing extension does not in any way limit NYCHA's right to extend the bid submission deadline for any other reason.  Prior to submitting a bid, please confirm that your bid response includes all required forms & Documentation, and that all required forms and documentation are properly completed, signed, and notarized, where applicable.

New York
Due Aug 21, 2026View bid
SAM.govCloses in 15 days

Y1DZ--556-24-122 B132 Pool and HVAC Replacement

Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project #556-24-122 B132 Pool & HVAC Replacement. The primary purpose of this project is to renovate the pool and bring it into compliance with current codes as well as making it Architectural Barriers Act (ABA) complaint. Pool plumbing and associated systems are to be replaced/modernized in accordance with design drawings. Staff and patient locker rooms will be made ABA complaint. Additionally, the pool area is to have the old AHU located on the elevated platform demolished and replaced with new exterior pad mounted AHU.

North Chicago
Due Aug 21, 2026View bid
CanadaBuysCloses in 15 days

Optimization of Space in AAQS Labs (167/167A)

Environment and Climate Change Canada (ECCC) requires construction work to modernize and optimize laboratory space located within room 167/167a of ECCC’s laboratory facility at 335 River Road in Ottawa, ON. The goal of this project is to renovate and update the architectural, electrical and mechanical elements of room 167/167a to meet the occupants’ current science requirements, as detailed in the Statement of Work, Annex A to the bid solicitation.

Gatineau, Quebec
Due Aug 21, 2026View bid
SAM.govCloses in 15 days

Boiler Maintenance

The boiler maintenance will provide all management, tools, supplies, equipment and labor necessary to perform all the work in maintaining 94 existing boilers/water heaters located in 71 facilities across Minot AFB, ND. The Contractor must assume maintenance of any new boilers installed for the duration of the boilers warranty (1) year from date of completed installation. Contractors will also be required to remove and dispose of existing boilers as well as install new boilers, up to 12 per year, not to exceed two every 30 days. List of attachments: 1. Performance Work Statement 2. Price Schedule 3. Provisions and Clauses 4. Wage Determinations 5. Financial Questionnaire 6. Combined Synposis/Solicitation

United StatesPlumbing · HVAC Mechanical
Due Aug 21, 2026View bid
LA RAMPCloses in 15 days

FORMAL 2710026 CLIFFORD STREET MATH & TECHNOLOGY MAGNET ES

SEEDS (Sustainable Environment Enhancement Developments for Schools)

California
Due Aug 21, 2026View bid
SAM.govCloses in 16 days

HVAC Preventative Maintenance Service

The Embassy of the United States of America 376 Jalan Tun Razak 50400 Kuala Lumpur Dear Prospective Quoter: SUBJECT: HVAC Preventative Maintenance Service The Embassy of the United States of America invites you to submit a quotation for the procurement of HVAC Preventative Maintenance Service, Malaysia. The Embassy intends to award a single purchase order / contract for the required services. The Embassy intends to conduct a site visit. The site visit will be held on August 5, 2026, at 10:00 AM Kuala Lumpur time at the US Embassy Kuala Lumpur. Prospective offerors/quoters should contact ratnasingamp@state.gov by July 31, 2026, at 12:00 PM for additional information or to arrange entry to the building. Kindly refer to the attached scope of work (SOW) for further details. Your quotation must be submitted electronically to KualaLumpurDTO@state.gov marked "Quotation Enclosed - HVAC Preventative Maintenance Service" to the Contracting Officer, General Services Office, 376, Jalan Tun Razak, 50400 Kuala Lumpur on or before 12:00 noon on August 22, 2026. No quotations will be accepted after that time. Contractor must have valid and active registration in SAM.gov at the time of proposal submission for total value above USD40,000. Direct any questions regarding this solicitation to the Procurement Supervisor, Punitha by email at ratnasingamp@state.gov during regular business hours. Sincerely, Farouk Khan Contracting Officer

Kuala Lumpur
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

HVAC Preventative Maintenance Service

The Embassy of the United States of America 376 Jalan Tun Razak 50400 Kuala Lumpur Dear Prospective Quoter: SUBJECT: HVAC Preventative Maintenance Service The Embassy of the United States of America invites you to submit a quotation for the procurement of HVAC Preventative Maintenance Service, Malaysia. The Embassy intends to award a single purchase order / contract for the required services. The Embassy intends to conduct a site visit. The site visit will be held on July 29, 2026, at 10:00 AM Kuala Lumpur time at the US Embassy Kuala Lumpur. Prospective offerors/quoters should contact ratnasingamp@state.gov by July 24, 2026, at 12:00 PM for additional information or to arrange entry to the building. Kindly refer to the attached scope of work (SOW) for further details. Your quotation must be submitted electronically to KualaLumpurDTO@state.gov marked “Quotation Enclosed – HVAC Preventative Maintenance Service� to the Contracting Officer, General Services Office, 376, Jalan Tun Razak, 50400 Kuala Lumpur on or before 12:00 noon on August 22, 2026. No quotations will be accepted after that time. Contractor must have valid and active registration in SAM.gov at the time of proposal submission for total value above USD40,000. Direct any questions regarding this solicitation to the Procurement Supervisor, Punitha by email at ratnasingamp@state.gov during regular business hours. Sincerely, Farouk Khan Contracting Officer

Kuala Lumpur
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

Z--SEAZ CONCRETE FOUNDATION AND SLAB

SEAZ CONCRETE FOUNDATION AND SLAB

United StatesConcrete Forming Pouring
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

Notice of Award Architect-Engineer (AE) Services to support the Enterprise Builders Sustainment Management System (ESMS) Program for the U.S. Army Corps of Engineers (USACE) Mobile District (CESAM)

Notice of Award Architect-Engineer (AE) Services to support the Enterprise Builders Sustainment Management System (ESMS) Program for the U.S. Army Corps of Engineers (USACE) Mobile District (CESAM)

United States
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

47--AR-CACHE RIV NWR - Piping for Water Control Structures

AR-CACHE RIV NWR - Piping for Water Control Structures

United States
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

30--GUARD,MECHANICAL DR

Indefinite Delivery Contract: Estimated quantity 34.000 ; Not to Exceed 350,000.00

United States
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

Z--MORU Replace Door and Windows

This is a market research source sought announcement for a construction project to replace doors and windows at Mount Rushmore NM. See attachment.

United StatesMillwork Cabinetry
Due Aug 22, 2026View bid
SAM.govCloses in 16 days

CTNF Teton Basin Grants Darby Single Vault Toilet

Driggs
Due Aug 22, 2026View bid
SAM.govCloses in 17 days

J041--TVHS VFD Replacement

United StatesPlumbing · HVAC Mechanical
Due Aug 22, 2026View bid
SAM.govCloses in 17 days

Electric Motor Rebuild

Tinker AFB
Due Aug 22, 2026View bid
SAM.govCloses in 17 days

Bldg G560 Domestic Water Line Repairs

Camp LejeunePlumbing · HVAC Mechanical
Due Aug 23, 2026View bid
SAM.govCloses in 17 days

Corps Water Infrastructure Financing Program (CWIFP) Financial Transaction Processing Support

A firm fixed price contract was awarded competitively in response to solicitation W912HQ26RA007.

United States
Due Aug 23, 2026View bid