Skip to content
Contracts Finder (UK)Closes in 24 days

TD2340 - Framework for Highways Services

Civil · Electrical
Location
Derby, England, United Kingdom
Responses due
Nov 2, 2026

Overview

The Council is seeking to establish a multi-supplier Highways Framework Agreement to support the delivery of highway maintenance, improvement, construction, specialist services, materials supply, plant hire and associated activities across the highway network and related infrastructure. The Framework will provide a compliant and flexible route to market for planned and reactive works and services and will be divided into the following 11 lots: Lot 1 - Road Markings & High Friction Surfacing Lot 2 - Road Restraint Systems Lot 3 - Temporary Traffic Management Lot 4 - Traffic Signals Lot 5 - Multi-Disciplined Lot 6 - Carriageway Maintenance Lot 7 - Carriageway and Footway Surface Treatments Lot 8 - Hire of Equipment (with/without Operators) Lot 9 - Haulage with Driver Lot 10 - Supply of Asphalt Lot 11 - Highways Resource Support The Framework has an estimated core value of £72 million over its full term. In anticipation of Local Government Reorganisation (LGR), the Council reserves the right to vary the scope, value and volume of services procured through the Framework. Should additional requirements arise as a result of LGR, the total estimated Framework value may increase to a maximum of £108 million. The values attributed to individual lots are indicative only and do not represent any guarantee of expenditure. Actual spend may vary between lots depending on operational requirements, available funding and any changes arising from LGR. Call-off contracts may include highway maintenance works, specialist highway services, traffic management, supply of materials, plant and equipment hire, haulage services and resource support. Requirements may range from small-scale reactive works to larger planned maintenance and capital improvement schemes. Appointment to the Framework does not guarantee any minimum value or volume of work. Call-off contracts may be awarded by direct award and/or further competition in accordance with the Framework terms and procurement documents.

Documents (1)

Create a free account to open documents and respond.

Source: Contracts Finder (UK)View in Constructeams

Similar open bids

Contracts Finder (UK)Closes tomorrow

Manchester International Airport - OLE Phase 3 Works

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling

Clippers Quay, England£2,500,000 (est.)Civil
Due Oct 9, 2026View bid
Contracts Finder (UK)Closes in 6 days

Balfour Beatty - Roads North of the Thames - LTC - FRC Structures Package

The Lower Thames Crossing Roads, North Programme is seeking expressions of interest from suppliers with experience in reinforced concrete (FRC) and structural works. The scope is expected to include elements such as reinforced concrete foundations, abutments, retaining walls, pile caps, reinforced earth structures, bridge structures and other civil engineering works. As part of our procurement planning, we are considering a range of packaging options, including splitting the works into multiple packages. Through this PQQ, we are looking to better understand the market's capability, capacity and preferred delivery models to help inform the final procurement strategy. What We're Looking For We would like to hear from organisations with experience in one or more of the following: Reinforced concrete foundations Reinforced concrete abutments Reinforced concrete retaining walls Reinforced earth structures Pile caps and substructures Bridge and highway structures Structural concrete works Civil engineering and infrastructure projects Design, construction, supply and installation services Temporary works design and management Quality assurance, testing and commissioning We welcome responses from organisations of all sizes, including SMEs, either independently or as part of a consortium, joint venture or wider supply chain arrangement. How to Apply If you are interested in this opportunity, please complete the attached FRC Structures Package Eligibility Criteria Questionnaire and return it to the Supply Chain Team by 14.10.26 at: BBLTCProcurementandSupplyChain@balfourbeatty.com Please ensure all sections of the questionnaire are completed, as this will help us gain a full understanding of your organisation's capabilities, capacity and experience. The qualification questions have been designed to assess your ability to meet Balfour Beatty and Lower Thames Crossing supply chain requirements and will help inform the final packaging strategy for these works. As we are currently considering a number of packaging options, including smaller and specialist work packages, we are particularly interested in understanding the scale of work your organisation can deliver, your technical capabilities and your preferred delivery model. Additional information: The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs and businesses to opportunities, leaving a skills legacy for the local community and construction industry, all whilst restoring nature and drawing a new blueprint for low-carbon construction. Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions: • Delivering the works through a 'zero emissions' solution, and not using diesel on site in any plant or machinery. • Supporting us to leave a skills legacy for the local community, by not only recruiting locally, but upskilling your workforce to enable meaningful progression into higher paid higher skilled work. • Helping to facilitate successful opportunities by providing early careers roles, as well as inspiring young people into construction through delivery of STEM engagement.

London, England£1,000,000 (est.)Civil · Concrete
Due Oct 14, 2026View bid
Contracts Finder (UK)Closes in 8 days

Manchester International Airport - Shotcrete works

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

Clippers Quay, England£500,000 (est.)Concrete · Civil
Due Oct 16, 2026View bid
Contracts Finder (UK)Closes in 12 days

GB-Colchester: 0502 - PA Unadopted Highways

Significant repairs to the public hard surface areas on the un-adopted highway within the Colchester Borough.

Colchester, England£5,000,000 (est.)Civil
Due Oct 21, 2026View bid
Contracts Finder (UK)Closes in 15 days

A66 Northern Trans Pennine Project(NTP) - Schemes 1, 2 Traffic Signals Package

Kier Infrastructure are looking to engage experienced and qualified contractors to carry out works pertaining to the Traffic Signals package on the A66 Northern Trans-Pennine scheme (Schemes 1 & 2). The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.

Salford, England£400,000 (est.)Electrical
Due Oct 23, 2026View bid
Contracts Finder (UK)Closes today

Kier Infrastructure - UXO Site Surveys

Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope is the supply of Explosive Ordnance Clearance(EOC) Engineer Site Surveys to support intrusive activates when work is completed within Medium or High Risk UXO (Unexploded Ordinance) Areas.

Clippers Quay, England£150,000 (est.)
Due Oct 8, 2026View bid