Skip to content
Contracts Finder (UK)Closes today

Kier Infrastructure - UXO Site Surveys

Location
Clippers Quay, England, United Kingdom
Responses due
Oct 8, 2026
Budget
£150,000 (est.)

Overview

Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope is the supply of Explosive Ordnance Clearance(EOC) Engineer Site Surveys to support intrusive activates when work is completed within Medium or High Risk UXO (Unexploded Ordinance) Areas.

Source: Contracts Finder (UK)View in Constructeams

Similar open bids

Contracts Finder (UK)Closes tomorrow

Procurement of Facility Maintenance, Fluid-Handling and Food-Service Equipment

Chemonics Group UK Limited which is implementing the Partnership Fund for a Resilient Ukraine Phase 2 (PFRU-2) Project as part of international technical assistance (hereinafter referred to as Chemonics) invites you to submit a Tender for Procurement of Facility Maintenance, Fluid-Handling and Food-Service Equipment

Kyiv, England£1 (est.)Demolition · Concrete
Due Oct 9, 2026View bid
Contracts Finder (UK)Closes tomorrow

Ascent Homes - Coulson Park - Roads & Sewers

Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires a Roads & Sewers sub-contractor for our new build housing development consisting of 57no new build plots in Coulson Park, Ashington, Northumberland. All tender documentation can be found on the ProContract Portal

Ashington, England
Due Oct 9, 2026View bid
Contracts Finder (UK)Closes tomorrow

Manchester International Airport - OLE Phase 3 Works

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling

Clippers Quay, England£2,500,000 (est.)Civil
Due Oct 9, 2026View bid
Find a Tender (UK)Closes in 4 days

Units 1-5, Centennial Park, Airspeed Road, Portsmouth

The procurement is being conducted to appoint a contractor for the design and construction of 5 single storey warehouse units at Centennial Park, Airspeed Road, Portsmouth. The units generally range from between 8m and 12m to underside of haunch with a gross internal area of approximately 53,000 ft2 and incorporate internal mezzanine office accommodation. External works are required which include, but may not be limited to, hard standings, car parking, landscaping, drainage, fencing and street furniture, external lighting, EV chargers and main service connections. The procurement is being conducted by DTZ Investors for Glasgow City Council (the Council) as administering authority for the Strathclyde Pension Fund (the Fund). The Fund is part of the Local Government Pension Scheme (LGPS) and is one of the 11 LGPS funds in Scotland and around 100 in the UK. Quartz Project Services Limited are the project managers for the project. The successful bidder will enter into the contract for the works with the Council.

Glasgow, England£8,000,000 (est.)
Due Oct 12, 2026View bid
Contracts Finder (UK)Closes in 4 days

CA18408 - Mental Health Emergency Department (MH ED)

Tender to undertake building works to remodel existing estate to provide a new Mental Health ED department. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18408. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18408 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.

Bath, England£2,500,000 (est.)
Due Oct 12, 2026View bid
Contracts Finder (UK)Closes in 4 days

Surlingham Play Area

Surlingham Parish Council conducted a public consultation in April 2026 to gather views on the condition and future development of Surlingham Play Area. The consultation was promoted through multiple village channels and received responses from 21 households, plus two child friendly questionnaires via Surlingham School. Although participation was modest, the feedback provides clear and consistent direction for refurbishment priorities. The findings highlight concerns around safety, accessibility, equipment suitability, and the overall quality of the play environment.

Norwich, England£40,000 (est.)
Due Oct 12, 2026View bid