Skip to content
Contracts Finder (UK)Closes in 8 days

Manchester International Airport - Shotcrete works

Concrete · Civil
Location
Clippers Quay, England, United Kingdom
Responses due
Oct 16, 2026
Budget
£500,000 (est.)

Overview

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

Source: Contracts Finder (UK)View in Constructeams

Similar open bids

Contracts Finder (UK)Closes tomorrow

Procurement of Facility Maintenance, Fluid-Handling and Food-Service Equipment

Chemonics Group UK Limited which is implementing the Partnership Fund for a Resilient Ukraine Phase 2 (PFRU-2) Project as part of international technical assistance (hereinafter referred to as Chemonics) invites you to submit a Tender for Procurement of Facility Maintenance, Fluid-Handling and Food-Service Equipment

Kyiv, England£1 (est.)Demolition · Concrete
Due Oct 9, 2026View bid
Contracts Finder (UK)Closes tomorrow

Manchester International Airport - OLE Phase 3 Works

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling

Clippers Quay, England£2,500,000 (est.)Civil
Due Oct 9, 2026View bid
Contracts Finder (UK)Closes in 6 days

Balfour Beatty - Roads North of the Thames - LTC - FRC Structures Package

The Lower Thames Crossing Roads, North Programme is seeking expressions of interest from suppliers with experience in reinforced concrete (FRC) and structural works. The scope is expected to include elements such as reinforced concrete foundations, abutments, retaining walls, pile caps, reinforced earth structures, bridge structures and other civil engineering works. As part of our procurement planning, we are considering a range of packaging options, including splitting the works into multiple packages. Through this PQQ, we are looking to better understand the market's capability, capacity and preferred delivery models to help inform the final procurement strategy. What We're Looking For We would like to hear from organisations with experience in one or more of the following: Reinforced concrete foundations Reinforced concrete abutments Reinforced concrete retaining walls Reinforced earth structures Pile caps and substructures Bridge and highway structures Structural concrete works Civil engineering and infrastructure projects Design, construction, supply and installation services Temporary works design and management Quality assurance, testing and commissioning We welcome responses from organisations of all sizes, including SMEs, either independently or as part of a consortium, joint venture or wider supply chain arrangement. How to Apply If you are interested in this opportunity, please complete the attached FRC Structures Package Eligibility Criteria Questionnaire and return it to the Supply Chain Team by 14.10.26 at: BBLTCProcurementandSupplyChain@balfourbeatty.com Please ensure all sections of the questionnaire are completed, as this will help us gain a full understanding of your organisation's capabilities, capacity and experience. The qualification questions have been designed to assess your ability to meet Balfour Beatty and Lower Thames Crossing supply chain requirements and will help inform the final packaging strategy for these works. As we are currently considering a number of packaging options, including smaller and specialist work packages, we are particularly interested in understanding the scale of work your organisation can deliver, your technical capabilities and your preferred delivery model. Additional information: The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs and businesses to opportunities, leaving a skills legacy for the local community and construction industry, all whilst restoring nature and drawing a new blueprint for low-carbon construction. Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions: • Delivering the works through a 'zero emissions' solution, and not using diesel on site in any plant or machinery. • Supporting us to leave a skills legacy for the local community, by not only recruiting locally, but upskilling your workforce to enable meaningful progression into higher paid higher skilled work. • Helping to facilitate successful opportunities by providing early careers roles, as well as inspiring young people into construction through delivery of STEM engagement.

London, England£1,000,000 (est.)Civil · Concrete
Due Oct 14, 2026View bid
Contracts Finder (UK)Closes in 7 days

TD2414 - Asbestos Removal and Remediation Services and Asbestos Analyst Services

Derby City Council (the Council) is undertaking this procurement to establish two contracts: • Lot 1 Asbestos removal and remediation services • Lot 2 Asbestos analyst services The procurement process adopted by the Council is based on the 'Open' tendering procedure as detailed in the Procurement Act 2023 (the "Act") and the Procurement Regulations 2024 (the "Regulations".) For Lot 1 the asbestos removal and remediation services contract, the initial contract period is two years and is estimated to commence on 1st February 2027 and expire on 31st January 2029. For Lot 2 the asbestos analyst services contract, the initial contract period is two years and is estimated to commence on 13th February 2027 and expire on 12th February 2029. For both contracts there will be an option to extend the contract for three (3) years in annual increments, subject to satisfactory performance and business needs. Maximum contract period is five (5) years. Local Government Reorganisation (LGR) is underway in several areas across the country and may result in changes to council structures, service delivery and responsibilities, and geographical coverage during the life of the contract. For this contract it is anticipated that the effects of LGR may lead to an increased service demand or the need to extend provision to new areas or client groups. For Lot 1 the asbestos removal and remediation services contract, bidders should note that the total estimated contract value of £1,172,000, comprises of two components: i) The core contract value, estimated at £293,000, based on known current service requirements ii) An additional estimated value of £879,000 to reflect potential future changes in service scope or volume linked to LGR. For Lot 2 the asbestos analyst services contract, bidders should note that the total estimated contract value of £2,616,000, comprises of two components: i) The core contract value, estimated at £654,000, based on known current service requirements ii) An additional estimated value of £1,962,000 to reflect potential future changes in service scope or volume linked to LGR. These figures are estimations and due to only being in the early stages of the process the Authority cannot give any commitment on these figures but would like to build scope into the Contract should the need arise.

Derby, England£3,788,000 (est.)Concrete
Due Oct 15, 2026View bid
Contracts Finder (UK)Closes in 13 days

GB-Colchester: 0502 - PA Unadopted Highways

Significant repairs to the public hard surface areas on the un-adopted highway within the Colchester Borough.

Colchester, England£5,000,000 (est.)Civil
Due Oct 21, 2026View bid
Contracts Finder (UK)Closes in 18 days

GB-Norwich: 26-017 - Euston Court Roof Handrail Installation and Associated Works

Broadland is inviting tenders for Euston Court, Great Yarmouth for the roof handrail installation and associated works. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

Norwich, England£25,000 (est.)Concrete
Due Oct 26, 2026View bid