Bid Board
1,136 live construction bids & tenders
Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.
NW 25th St: At Clinton Ave
REBUILD TRAFFIC SIGNAL, Safety Lighting at Intersection, Install Pedestrian Cross walk, Add Left Turn Lane
CR 427 AT BRUSHY CREEK
Replace Bridge and Approaches
US 79 at CR 308 - Signal FY 26
Install Traffic Signal
IH45 From Freestone CL to SH 14
Full depth concrete repair
CR 244 At Eads Creek
Replace Bridge and Approaches
VA; 0915-12-820; Illumination
Upgrade High Mast Illumination to LED at Interchanges. IH 10W at IH 410, IH 35S at IH 410, IH 35 at IH 37/US 281, IH 35 and IH 410E, and US 90 at SL 13 (Military Dr.)
US 59 Widening 2712 - Phase 1
Upgrade to Rural Freeway (Future I-69 Corridor) Construct main lanes, frontage roads and structures to convert 4 lane divided highway to 6 lane divided freeway with 2 lane frontage roads in each direction.
US 287; N of Harmon Rd to N of IH 35W
RECONSTRUCT 2 LANE ONE WAY TO 2 LANE ONE WAY SOUTHBOUND FRONTAGE ROAD
US 290 - At FM 973
Construct offset dual left turn lanes
UA 90: FM 359 TO W of SH 99
Reconstruct and Widen from 4 to 6-Lane Divided (Phase 2 of 3)
CR 245 BRIDGE REPLACEMENT 2602
Replace Bridge and Approaches
CR 35080 Bridge Replacement
Bridge Replacement
FM 81 Karnes 181 to 1144 rehab
Rehab and widen roadway including extension of bridge class culverts
US83 Bridge Replacement Nueces River
REPLACEMENT OF ON-SYSTEM BRIDGE US 83 AT NUECES RIVER
US 81/287; N of Harmon Rd to N of IH 35W
RECONSTRUCT NB AND SB EXIT RAMP TO HARMON ROAD/NORTH TARRANT PARKWAY AND SB ENTRANCE RAMP FROM HARMON ROAD
US 290 - Gregg Manor Rd to FM 973
FDR, BONDING COURSE, TOM
FM 1131-(FM 2246-FM 105) OVERLAY
FM 1131-(FM 2246 SOUTH to FM 105) OVERLAY
US 290 at FM 973 Traffic Signal Improve
Improve traffic signal
2023 HSIP CURVE (FM 563) CHEVRONS, RS
2023 HSIP CURVE (FM 563) FLASHING CHEVRONS, EDGELINE & CENTERLINE RS
IH 45 From SH 14 to IH 45
Full depth concrete repair
FY 26 District Wildflower Project
Plant wildflowers on right of way
FY 27-DISTRICT WIDE-PVMNT MARKINGS
FY 27-DISTRICT WIDE-PAVEMENT MARKINGS/Specified Location Safety Re-striping
FM 1942, From Crosby Lynchburg to N Main
Fiber installation to connect traffic signals
SH 21 at FM 908 R-Cut - FY 26
Install R-Cuts