Sources Sought / Market Intelligence: Multi-Projects for Air Force Reserve Command (AFRC) Program – Construction Management at Risk (CMAR) utilizing Other Transaction Authority (OTA)

Location
United States, United States
Responses due
Oct 14, 2026

Overview

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and planning purposes only. This announcement does not constitute a Solicitation, Request for Proposal (RFP), or Request for Project Proposals (RPP), and no formal solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any contract or agreement because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal or bid should a formal solicitation or project announcement be issued in the future. North American Industry Classification System (NAICS) Code: 236220 – Commercial and Institutional Building Construction and 237310 – Highway, Street and Bridge Construction. (Note: While Other Transaction Authority is not governed by Federal Acquisition Regulation (FAR)-based small business set-aside regulations, this NAICS code is provided for market research purposes to assist the Government in understanding the industrial base demographics and capability.) Small Business Size Standard: $45.0 Million _______________________________________________________________ PROGRAM & PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, is conducting market intelligence to assess industry interest, capability, and commercial best practices for delivering multiple military construction (MILCON) / sustainment projects for the Air Force Reserve Command (AFRC) program utilizing Construction Management at Risk (CMAR) executed under Other Transaction Authority (OTA) pursuant to Title 10, United States Code (U.S.C.) Section 2808a. The Louisville District intends to award six separate, standalone OT agreements (one per project), while using this consolidated RFI to survey industry capacity and interest in CMAR with OTA across multiple projects within the Air Force Reserve portfolio. The projects under evaluation include: Project 1: Mass Parking Apron (MPA) Paving Rows C&D — Grissom Air Reserve Base, Indiana Estimated Acquisition Magnitude: $35,000,000 – $45,000,000 Scope of Work Summary: Correct approximately 9.6 acres of failing Mass Parking Apron paving through full-depth Portland cement concrete pavement replacement to support KC-135 and KC-46 aircraft operations at Grissom Air Reserve Base (ARB), Indiana. Due to the required concrete volume, the project requires an on-site concrete batch plant. The project also includes partial replacement of existing storm-drainage utilities supporting the apron. Current Design Status: The design is 65% complete. The Designer of Record is working toward a 95% design deliverable in October 2026. Anticipated CMAR Entry Point: ~95% Design Project 2: Combined Operations Facility Niagara Falls Air Reserve Station, New York Estimated Acquisition Magnitude: $35,000,000 – $50,000,000 Scope of Work Summary: Construct a new two-story, 54,000 square foot facility to consolidate the 914 Operations Group functions, including the 914 Operations Group Staff, 914 Operations Support Squadron (with Aircrew Flight Equipment), 328th Air Refueling Squadron, and 914th Aeromedical Evacuation Squadron. The facility will provide administrative, operational, training, and support spaces to include a command suite, crew readiness areas, kitchen/dining and sleeping quarters for 10 alert aircrew, fitness and locker facilities, flight planning, SERE, night vision device maintenance, mobility operations, weather, secured briefing rooms, and a multi-use auditorium, along with shared conference, break, and storage spaces. The project includes a reinforced concrete foundation with spread footings, reinforced masonry walls with brick veneer, structural steel framing, standing seam metal roof, elevator, emergency generator, fire protection, mass notification, communications, exterior lighting, and all supporting utilities. Site improvements will include access roads, parking, sidewalks, and stormwater management. The facility is located along the airfield and potential PFAS-contaminated soil, and groundwater may be encountered and require testing for appropriate management and disposal during construction. Current Design Status: The design is 100% complete (Certified Final) but requires a Unified Facilities Criteria (UFC) refresh. Anticipated CMAR Entry Point: ~95% Design Project 3: Renovate Fuel Cell Hangar, Building 647– Patrick Space Force Base, FL Estimated Acquisition Magnitude: $18,000,000 – $30,000,000 Scope of Work Summary: The Government requires comprehensive repair and renovation of Fuel Cell Hangar Building 647 to restore full operational capability in support of aircraft fuel cell maintenance activities. The work encompasses the hangar bay, associated maintenance areas, and administrative spaces. The project includes testing for hazardous materials and appropriate abatement where required. Exterior work includes full roofing system replacement (including gutters and downspouts), replacement of louvers and windows, reskinning of the hangar exterior with insulated panels, major repairs to hangar doors and top rails, replacement of roll-up doors (including the aircraft tail rudder door), replacement of exterior man doors, repair of the exterior stairway, and replacement of the lightning protection system. Interior work includes reconfiguring the first and second floor administrative spaces to meet user requirements and standards, including a breakroom and conference room on the second floor. Major building systems requiring repair or replacement include heating, ventilation, and air conditioning; electrical distribution and related components; fire protection and suppression systems (including removal of existing foam systems and installation of a code-compliant replacement); communications infrastructure; provide a new fire alarm/mass notification system, and all associated control systems. Site preparation, utility connections, and related support work are also included. All work shall be performed in accordance with applicable Unified Facilities Criteria, National Fire Protection Association standards, and installation requirements. Sustainable design and construction practices consistent with current Department of Defense guidance will be incorporated. Current Design Status: The design is 65% complete. Anticipated CMAR Entry Point: ~95% Design Project 4: Communications Facility – Pittsburgh Air Reserve Station, PA Estimated Acquisition Magnitude: $15,000,000 – $30,000,000 Scope of Work Summary: Construction of a new 11,615 SF facility to support the mission of the 911th Communications Squadron. Construction to include concrete foundation and floor slab, steel frame, roof, CMU or metal stud backup, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air-conditioning, electrical and communications systems, emergency generator, delivery and storage area, and supporting utility infrastructure. The project will include demolition of the existing facility with exception of the demarcation room and construct sidewalks and horizontal assets. Due to cost and the Growth Off Set Policy, the demolished facility will be replaced with one of equal size. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. Sustainable principles, to include life-cycle cost effective practices will be integrated with the design, development and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of life-cycle cost analysis for energy consuming systems, renewable energy generating systems. This project will comply with the Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Current Design Status: The design is 100% complete (Corrected Final). Anticipated CMAR Entry Point: ~95% Design Project 5: Repair East Apron Asphalt Surface – Westover Air Reserve Base, MA Estimated Acquisition Magnitude: $10,000,000 – $30,000,000 Scope of Work Summary: Demolish asphalt pavement on East Apron and in front of Hangar 7040, full depth. Work shall include full-depth pavement replacement. Install new base material and airfield hot mix asphalt. Install pavement markings according to applicable airfield requirements. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200- 02. Provide a load bearing asphalt transition surface between aircraft parking spots to support Regional ISO Maintenance and 8 permanently assigned C-5M aircraft. The objective of this project is to reconstruct the taxi-lane portion of the ramp and the hangar access apron with a new bituminous asphalt pavement profile which will provide the required structural capacity to support the primary mission of the C-5M located at Westover ARB. The project will also include stormwater drainage modifications to address surface drainage deficiencies. Underdrains will be incorporated in the new construction. Current Design Status: The design is 35% complete. The Designer of Record is working toward a 65% design deliverable in October 2026. Anticipated CMAR Entry Point: ~95% Design Project 6: Taxiway Golf Extension, Westover Air Reserve Base, MA Estimated Acquisition Magnitude: $25,000,000 – $35,000,000 Scope of Work Summary: Construction of an extension of Taxiway Golf to provide a complete, permanent, and operational airfield facility. Work includes site preparation, earthwork, grading, stormwater drainage, placement of reinforced rigid concrete pavement, heavy-duty paved shoulders, taxiway edge lighting, airfield signage, UFC-compliant pavement markings, and the relocation of conflicting electrical and communications utilities. The project also encompasses the demolition and disposal of an existing CMU secondary electrical building, associated equipment pads (supporting a sectionalizing switch, transformer, and backup generator), and the secondary duct bank leading to the glide slope antenna. All construction activities must incorporate Best Management Practices (BMPs) to meet state stormwater discharge permits and fulfill state-mandated compensatory mitigation for impacted grassland bird habitat. Facilities and infrastructure must be designed and constructed as permanent facilities complying with DoD Unified Facilities Criteria (UFC)—specifically UFC 1-200-01 (General Building Requirements), UFC 1-200-02 (High Performance and Sustainable Building Requirements), and Antiterrorism/Force Protection (AT/FP) standards per UFC 4-010-01 and UFC 4-022-02. Airfield mix design approval by USACE Transportation Center of Expertise is mandatory. The location for an on-site batch plant has been approved. Current Design Status: The design is 100% complete (Corrected Final). Anticipated CMAR Entry Point: ~95% Design _______________________________________________________________ PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: CMAR VIA OTHER TRANSACTION AUTHORITY (OTA) The Louisville District is evaluating a Construction Management at Risk (CMAR) delivery strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting, and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. _______________________________________________________________ The CMAR Course of Action (10 U.S.C. § 2808a) Under this collaborative framework, the construction contractor is onboarded prior to construction execution (e.g., at 60%–100% maturity) to act as a design-assist preconstruction partner alongside the Government's Designer of Record (DOR), provide constructability reviews, etc.: Phase 1 – Preconstruction Services: The contractor is awarded a Phase 1 agreement to perform constructability and value engineering reviews and reports, building system optimization, supply chain lead-time mitigation, BIM clash detection, and open-book market trade pricing against Government MII (MCACES 2nd Generation) parametric estimates. Phase 2 – Construction Execution ("At-Risk"): As the design reaches 100% completion (or constructability reviews are completed), the contractor converts to an "At-Risk" general constructor under a negotiated Guaranteed Maximum Price (GMP). While the DOR retains professional engineering liability for the design, the contractor assumes responsibility for construction coordination, site logistics, schedule compliance, and trade execution. Phase 2 will be executed via bilateral modification to the agreement. If a GMP cannot be agreed upon, the Government retains an “off-ramp” to execute the physical construction under a separate acquisition strategy. Pricing Structure Preconstruction Services Fee: A defined, firm-fixed-price fee compensating the builder for preconstruction consulting, value engineering, cost modeling, and scheduling support. The Target Fee (CMAR Fee): The contractor's transparent corporate markup and management fee for the construction phase, established competitively during Phase 1 selection. Guaranteed Maximum Price (GMP): The validated ceiling price for the construction effort, comprising Direct Subcontract Costs (derived through open-book market bidding) + Validated General Conditions + Agreed Target Fee + Shared Contingency Pool. Phased Execution Architecture Solicitation / Down-Select: Prospective vendors submit concise capability statements and narrative white papers detailing CMAR experience, past collaborative delivery performance, key personnel qualifications, and preconstruction management approach. Oral Presentations / Pitch Meetings: Shortlisted teams present their approach to Government stakeholders, demonstrating how their Preconstruction Director, Project Manager, and Superintendent will interface with the DOR and USACE cost engineers. Bridging the Final Design Gap: The builder actively evaluates design options, verifies local trade availability, and executes subcontractor bid packaging. Risk Allocation: During Phase 1, the builder actively identifies ambiguities and constructability conflicts. Upon bilateral agreement on the GMP and execution of Phase 2, the contractor cannot submit claims for constructability coordination errors or field interferences that should reasonably have been addressed during the collaborative preconstruction phase. _______________________________________________________________ INFORMATION REQUESTED FROM INDUSTRY Interested firms are invited to provide comprehensive responses to the questions below to assist the Louisville District in tailoring this acquisition. Section 1: Company Profile & Project Interest 1. Firm Information: Firm Name: Corporate Address: Point of Contact (Name, Title, Phone, Email): Unique Entity ID (UEI) & Commercial and Government Entity (CAGE) Code: Socioeconomic Classification(s) (e.g., Other Than Small Business, Small Business, Small Disadvantaged (SDB), 8(a), Service-Disabled Veteran-Owned (SDVOSB), Woman-Owned Small Business (WOSB), Historically Underutilized Business Zone (HUBZone). 2. Project Interest: Indicate which of the projects your firm would potentially compete for: MPA Paving Rows C&D — Grissom Air Reserve Base, IN Combined Operations Facility Niagara Falls Air Reserve Station, NY Renovate Fuel Cell Hangar, Building 647– Patrick Space Force Base, FL Communications Facility – Pittsburgh Air Reserve Station, PA Repair East Apron Asphalt Surface – Westover Air Reserve Base, MA Taxiway Golf Extension, Westover Air Reserve Base, MA 3. Role: What is your anticipated teaming role (e.g., Prime CMAR Contractor, Joint Venture Partner, Major Specialty Subcontractor)? Section 2: Other Transaction Authority (OTA) & Statutory Flexibilities 4. OTA Experience: What experience does your organization have executing projects utilizing Other Transaction Authorities (10 U.S.C. § 2808a, 10 U.S.C. § 4022, or civilian equivalent)? Section 3: CMAR Delivery & Multi-Project Considerations 5. Design Entry Point: Given that the six (6) projects are currently at 65% design and beyond, what is the optimal design maturity point for your firm to enter as a CMAR partner to provide maximum cost and schedule benefits? Provide thoughts on CMAR at >90% stage, allowing for constructability reviews, cost estimating, and open book negotiations/GMP prior to construction execution vs. traditional FAR-based Design-Bid-Build. 6. Design Maturity & Early-Builder Benefits: Given the scale of these Army Reserve Center projects, what are the primary benefits of bringing on a CMAR builder during the preconstruction phase (e.g., at 90% design), and how can the Government maximize those benefits? Section 4: Specialized Facility & Technical Capabilities 7. Heavy-Duty Airfield Paving (Grissom ARB & Westover ARB): Describe your firm’s experience with large-scale, heavy-duty airfield pavement projects for strategic air mobility aircraft (e.g., C-5M, KC-46). Specifically, address experience with both full-depth Portland Cement Concrete (PCC) and hot mix asphalt replacement, operation of on-site concrete batch plants, installation of taxiway lighting and signage, and managing construction phasing on an active airfield. 8. Multi-Story Mission Operations Facilities (Niagara Falls Air Reserve Station (ARS)): Describe your firm's experience constructing new multi-story operational facilities for military clients. Highlight experience with mixed-use spaces including administrative offices, secure briefing rooms, alert crew quarters (lodging/dining), and training areas. Address your approach to meeting DoD Anti-Terrorism/Force Protection (AT/FP) standards and managing projects with potential soil or groundwater contamination (e.g., PFAS). 9. Hangar Renovation & Systems Modernization (Patrick Space Force Base (SFB)): Detail your firm’s experience in the comprehensive renovation of aircraft maintenance hangars. Describe projects involving the replacement of major building systems (HVAC, electrical), removal and replacement of legacy fire suppression systems (e.g., AFFF/foam), full building envelope restoration (roofing, wall panels), and repair/replacement of large-scale hangar door systems. 10. Mission-Critical Communications Facilities (Pittsburgh ARS): Describe your experience constructing facilities designed to support critical communications squadrons or data center operations. Include experience with electrical and HVAC system redundancy, emergency power generation, and building security and infrastructure required to meet UFC 4-010-01 for Antiterrorism/Force Protection. 11. Airfield Environmental & Utility Coordination (Westover ARB): Detail your experience executing airfield projects that required significant environmental coordination and mitigation, such as compensatory mitigation for impacted wildlife habitats. Additionally, describe your experience with projects involving the demolition and relocation of critical airfield utilities like electrical duct banks and communications lines. Section 5: Bonding & Financial Capacity 12. Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. Section 6: Feedback on the Acquisition Strategy & Alternatives: 13. Does the proposed CMAR-OTA strategy incentivize your firm to participate? Why or why not? 14. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? 15. Differentiating Evaluation Criteria: To differentiate high-performing CMAR collaborative builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery/CMAR performance, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at https://forms.osi.apps.mil/r/JC6MaPurdX or via the QR Code provided in the attachment. Please submit your responses by 14 October 2026 at 1100 Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. Survey Link: https://forms.osi.apps.mil/r/JC6MaPurdX

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

Bitterroot Front 10 Year G-Z IRSC

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26R4014 is issued as a Request for Proposal (RFP) for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract. The Bitterroot Front Project area spans roughly 145,000 acres across the Stevensville and Darby Ranger Districts, where dense, overstocked mixed?conifer stands and widespread tree mortality have increased susceptibility to insect outbreaks and extreme wildfire behavior. Following a decade of severe fires, the project aims to reduce wildfire risk to nearby communities and restore forest health through treatments such as thinning, harvesting, mechanical fuel reduction, and prescribed burning. These efforts focus on improving stand vigor, promoting fire?adapted species, reducing hazardous fuels, and enhancing safety and effectiveness for wildfire responders. A secondary objective of the long?term contract is to provide a consistent timber supply for local forest products industries, while contractors complete tasks including unit layout, timber cruising, road work, and timber removal as part of a broader strategy to increase the pace and scale of forest restoration. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Proposals are to be submitted via email to Mark Phillipp at mark.phillipp@usda.gov and Matt Daigle at matthew.daigle@usda.gov.

United States
Due Oct 8, 2026View bid
SAM.govCloses today

Bitterroot Front 10 Year G-Z IRSC

8/3/2026- Replaces word versions of Attachements C04c_2a, C04d_3a and C04e_4a (Appendicies A-C) with PDFs. No other corrections. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26R4014 is issued as a Request for Proposal (RFP) for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract. The Bitterroot Front Project area spans roughly 145,000 acres across the Stevensville and Darby Ranger Districts, where dense, overstocked mixed?conifer stands and widespread tree mortality have increased susceptibility to insect outbreaks and extreme wildfire behavior. Following a decade of severe fires, the project aims to reduce wildfire risk to nearby communities and restore forest health through treatments such as thinning, harvesting, mechanical fuel reduction, and prescribed burning. These efforts focus on improving stand vigor, promoting fire?adapted species, reducing hazardous fuels, and enhancing safety and effectiveness for wildfire responders. A secondary objective of the long?term contract is to provide a consistent timber supply for local forest products industries, while contractors complete tasks including unit layout, timber cruising, road work, and timber removal as part of a broader strategy to increase the pace and scale of forest restoration. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Proposals are to be submitted via email to Mark Phillipp at mark.phillipp@usda.gov and Matt Daigle at matthew.daigle@usda.gov.

United States
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_Services IDIQ Contract for Annual Cleaning and Inspection of Gravity Roof Tanks at Various NYCHA Buildings, Citywide

Scope of Work:  The annual inspection, cleaning and disinfection of roof tanks on NYCHA properties in compliance with all applicable New York City, New York State, and Federal regulations. at various developments citywide. All work shall comply with applicable laws, codes and standards, including but not limited to NYC Health Code §§ 141.07 & 141.09, Rules of the City of New York, Title 24, Chapter 31, NYC Administrative Code § 17-194, Plumbing Code §§ 606.5 / 606.5.4.3, NYS Sanitary Code, Part 5, ANSI/AWWA/APHA/WEF Industry Standards, Safe Drinking Water Act (SDWA), §28-301.1 of the NYC Construction Code, NYC Local Law 76, Occupational Safety and Health Administration (OSHA) as well as any other regulatory requirements that pertain to gravity water tanks (roof tanks) within the city of New York. Each tank shall be inspected, cleaned, disinfected and sampled for E.Coli and Total Coliform at a minimum annually during each one (1) year period of this contract. Tanks may be cleaned and sampled multiple times a year. Contract Term: 3 years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to 2 one-year renewals. Bid Security: 100% of Contract Minimum. Payment & Performance Bonds: 100% of Minimum. Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law. The Bidder and each subcontractor must be registered with the New York State Department of Labor. See https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ.  This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov  Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-bid Conference will be held on September 9, 2026, at 1:00 PM  To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: https://teams.microsoft.com/meet/284356622821641?p=SIlxBEu2AMZmRVxu4a Meeting ID: 284 356 622 821 641 Passcode: fk9AV7Yt Option 2: Dial in by phone +1-646-838-1534 United States, New York City Phone conference ID: 638894668# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should be sent to the following email address: construction.procurement@nycha.nyc.gov. Question & Answer Release Date: September 23, 2026. Only questions regarding this RFQ submitted to construction.procurement@nycha.nyc.gov (include RFQ number in subject field) prior to Question Deadline will be accepted. In addition to the documents attached below, bidders are directed to review the Special Notices and Conditions, Instructions to Bidders, and General Conditions prior to submitting a bid.  To access these documents, click on the 'Contract Terms' tab above, and then 'Preview Contract Terms,' to download a PDF version. Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_Services_Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Repair of Gravity Roof Tanks (Office of Water Quality) at Various NYCHA Buildings Citywide

Scope of Work: The scope of work includes repairing any leaks, cracks, or damage found in wooden or steel gravity tanks, including but not limited to conical covers, flat decking, hatch doors, ladders, plugs, strainers, piping, plumbing components, valves, electrical systems, probes, control wiring, conduit, co applicable city, state, and federal codes, regulations, all materials, equipment, and workmanship used in these repairs shall comply with all relevant city, state, and federal codes, as well as applicable regulations and industry standards governing construction, safety, and domestic water systems. Contract Term: three years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to two one-year renewals. Bid Security: 100% of Contract Minimum ($50,000). Payment & Performance Bond:100% of Minimum ($50,000). Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law .The Bidder and each subcontractor must be registered with the New York State Department of Labor. https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ. This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov. Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-Bid Conference will be held on September 9, 2026, at 3:00 PM, and will be conducted remotely via Microsoft Teams meeting. To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: Join: https://teams.microsoft.com/meet/247843415108182?p=s7S895ctg6lwFXC4rX Meeting ID: 247 843 415 108 182 Passcode: f4oN2E3n Option 2: Dial in by phone +1 646-838-1534,,168007653# United States, New York City Phone conference ID: 168 007 653# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should only be sent to the following email address: construction.procurement@nycha.nyc.gov.  Question & Answer Release Date: September 23, 2026 Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_A&CM_RFQ #517985 - Elevator Rehabilitation at Cassidy Lafayette/Woodson Houses

Scope of Work * The Work under this Contract (RFQ No. 517985  Elevator Package) consists of the rehabilitation, modernization, maintenance, and service of twelve (12) elevators across six (6) residential buildings, including eight (8) elevators in four (4) buildings at Cassidy-Lafayette Houses and four (4) elevators in two (2) buildings at Woodson Houses. The Contractor shall provide all labor, materials, equipment, supervision, and incidental services necessary to complete the Work in accordance with the Contract Documents. * The scope includes, but is not limited to, the removal and replacement of existing elevator systems and the furnishing and installation of new elevator equipment, including machines, controls, hoistway components, car enclosures, doors, rails, communication systems, safety devices, and associated electrical components. The Work also includes testing, inspection, commissioning, training, and coordination with NYCHA and other trades, including a separate electrical package. * The Work shall be performed in phased construction to maintain building operations, with coordination requirements intended to minimize service interruptions and impacts to residents. The Contractor shall comply with all scheduling, outage duration, and performance requirements established in the Contract Documents. * In addition to construction and modernization activities (Part A), the Contractor shall enter into a separate Maintenance and Service Agreement (Part B) to provide ongoing elevator maintenance and support services following completion of modernization.   RFQ Solicitation Timetable A non-mandatory virtual pre-bid conference will be held on 09/23/2026 at 11:00 am, via Microsoft Teams. Pre bid Teams Meeting information: (646) 838-1534 Conference ID: (232 863 912 982 698) Passcode: nx9B2q4T. Although attendance is not mandatory; it is strongly recommended that all interested vendors attend. https://teams.microsoft.com/meet/232863912982698?p=fwqq9XfVdWnGivNGMi All questions related to this RFQ are to be submitted via email to the A&CM Procurement Unit at acm.procurement@nycha.nyc.gov with the RFQ number as the Subject line by no later than 09/25/2026 on 2:00PM Bidders will be permitted to ask additional questions at the Pre-bid Conference. Responses to all submitted questions will be available for public viewing in Sourcing under the RFQ. Bid Submission Requirements Vendors shall electronically upload a single .pdf containing ALL components of the bid into iSupplier by the RFQ Bid Submission Deadline. NYCHA will NOT accept hardcopy Bids or bids via e-mail, fax, or mail. Instructions for registering for iSupplier can be found at http://www1.nyc.gov/site/nycha/business/isupplier-vendor-registration.page After Bidder registers for iSupplier, it typically takes 24 to 72 hours for Bidders iSupplier profile to be approved. Site Visits - September 24, 2026 RFQ Question Deadline - September 25, 2026 - 02:00 PM Question and Answer Release Date - October 01, 2026  It is Vendors sole responsibility to complete iSupplier registration and submit its Bid before the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. For assistance regarding iSupplier please email Procurement@nycha.nyc.gov

New York
Due Oct 8, 2026View bid
SAM.govCloses today

KB Duct List

Salient Characteristics SpecificationTitle: Galvanized Steel Quick-Disconnect Ductwork and Components for Air-Conditioning SystemSubject: Supply of modular galvanized steel quick-disconnect ductwork, fittings, dampers, and support hangers.Basis of Design: The part numbers below are for reference and configuration cross-reference. Products offered may be from another acceptable manufacturer, provided they meet or exceed all salient characteristics and are fully compatible with the complete ductwork system.1. Scope and PurposeThis requirement is for the supply and delivery only of galvanized steel, modular quick-disconnect ductwork and associated fittings for an air-conditioning system. The supplied components shall form a mutually compatible duct system consisting of straight duct sections, reducers, wye connectors, elbows, airflow dampers, and saddle hangers.Installation, field fabrication, field welding, and connection to existing equipment are not included unless specifically added elsewhere in the solicitation.2. General Salient Characteristics. All offered items shall meet the following minimum requirements: Material: Items 1 through 26 shall be galvanized steel only. No stainless steel, aluminum, plastic, or uncoated carbon-steel substitutes shall be accepted.System Compatibility: All duct, fittings, dampers, and hangers shall be compatible with the specified quick-disconnect duct system. Components of the same nominal duct diameter shall connect directly without adapters, field welding, rivets, sheet-metal screws, or permanent field modification.Quick-Disconnect Connection: Straight duct sections, reducers, wye connectors, elbows, tees, and dampers shall use a quick-disconnect connection configuration compatible with the remaining supplied components. Connection features shall permit assembly and disassembly of the duct system without damage to the duct or fittings.Nominal Dimensions: Duct diameters and fitting dimensions listed in the schedule are nominal inside diameters unless the manufacturer???s standard quick-disconnect system identifies dimensions differently. Reducers shall transition between the listed inlet and outlet diameters. Fittings shall be sized to directly mate with the corresponding duct diameter.Gauge Requirements: Straight duct sections and dampers shall be 20-gauge galvanized steel where identified in the schedule. Reducers, elbows, wye connectors, tees, and 90-degree fittings shall be 18-gauge galvanized steel where identified in the schedule. Saddle hangers shall be 14-gauge galvanized steel where identified in the schedule.Quality and Condition: Products shall be new, free of corrosion, dents, sharp edges, cracks, deformation, damaged coating, or manufacturing defects that would prevent proper assembly or service. Duct sections shall be round, and fittings shall retain their intended shape to allow proper connection. Components shall be packaged and shipped to prevent damage or distortion in transit.Equal Products: An offered equal product shall meet every listed dimensional material, gauge, connection, configuration, and quantity requirement. The offeror shall provide manufacturer specifications or product literature sufficient to verify compliance when requested.3. Required Items ScheduleItem. Required Item / Salient Characteristics. Minimum Material / Gauge. Qty. Reference No.*1. Quick-disconnect straight duct, nominal 24-inch diameter. Galvanized steel, 20 ga 17 EA 10024.2. Quick-disconnect reducer, 24-inch inlet to 22-inch outlet Galvanized steel, 18 ga 5 EA 16024.3. Quick-disconnect straight duct, nominal 22-inch diameter Galvanized steel, 20 ga 20 EA 10022.4. Quick-disconnect reducer, 22-inch inlet to 20-inch outlet Galvanized steel, 18 ga 5 EA 16022.5. Quick-disconnect straight duct, nominal 20-inch diameter Galvanized steel, 20 ga 17 EA 10020.6. Quick-disconnect reducer, 20-inch inlet to 18-inch outlet Galvanized steel, 18 ga 5 EA 16020.7. Quick-disconnect 45-degree wye connector, nominal 24-inch duct size Galvanized steel, 18 ga 1 EA 14224.45.8. Quick-disconnect 45-degree elbow, nominal 22-inch duct size Galvanized steel, 18 ga 1 EA 12022.45.9. Quick-disconnect manual butterfly valve airflow damper, nominal 22-inch duct size Galvanized steel, 20 ga 1 EA 19422.10. Quick-disconnect straight duct, nominal 18-inch diameter Galvanized steel, 20 ga 28 EA 10018.11. Quick-disconnect tee, 18-inch ?? 18-inch ?? 18-inch Galvanized steel, 18 ga 1 EA 14318.12. Quick-disconnect straight duct, nominal 16-inch diameter Galvanized steel, 20 ga 19 EA 10016.13. Quick-disconnect reducer, 18-inch inlet to 16-inch outlet Galvanized steel, 18 ga 3 EA 16018.14. Quick-disconnect 45-degree elbow, nominal 16-inch duct size Galvanized steel, 18 ga 2 EA 12016.45.15. Quick-disconnect manual butterfly valve airflow damper, nominal 16-inch duct size Galvanized steel, 20 ga 2 EA 19416.16. Quick-disconnect 90-degree elbow, nominal 20-inch duct size Galvanized steel, 18 ga 2 EA 12020.90.17. Saddle hanger sized for nominal 24-inch duct Galvanized steel, 14 ga 14 EA 17024.18. Saddle hanger sized for nominal 22-inch duct Galvanized steel, 14 ga 14 EA 17022.19. Saddle hanger sized for nominal 20-inch duct Galvanized steel, 14 ga 14 EA 17020.22. 16-inch galvanized clamp with white nitrile gasket, 27 EA 13016-GA-N.23. 18-inch galvanized clamp with white nitrile gasket, 30 EA 13018-GA-N.24. 20-inch galvanized clamp with white nitrile gasket, 25 EA 13020-GA-N.25. 22-inch galvanized clamp with white nitrile gasket, 28 EA 13022-GA-N.26. 24-inch galvanized clamp with white nitrile gasket, 24 EA 13024-GA-N.*Reference numbers are not brand-name requirements and are included only to identify the intended configuration and compatibility standard. Galvanized Ducting shall be Standard 5-feet Lengths and 11-inch Galvanized Standard Adjustable Sleeves where applicable.4. Component-Specific Requirements shall be galvanized steel:4.1 Saddle Hangers (items 17-21) used for handing duct systems and reducing sway Shall be nominal 24-inch diameter 14 ga 14 EA 17024, 22-inch diameter 14 ga 14 EA 17022, 20-inch diameter 14 ga 14 EA 17020, 18-inch diameter 14 ga 18 EA 17018, or 16-inch diameter 14 ga 14 EA 17016, as identified in the item schedule. Shall use the required quick-disconnect end configuration.4.2 Reducers Shall be galvanized steel, 18 gauge. Shall provide the listed nominal transitions: 24 x 22 inches, 22 x 20 inches, 20 x 18 inches, and 18 x 16 inches. Shall have quick-disconnect ends compatible with the adjoining duct sections.4.3 Elbows, Wye Connector, and Tee, shall be galvanized steel, 18 gauge. Shall have the listed nominal diameter and directional configuration. The wye connector and applicable elbows shall be 45 degrees as listed. The 20-inch elbow shall be 90 degrees. The tee shall be 18 inches ?? 18 inches ?? 18 inches. All ends shall be compatible with the required quick-disconnect duct system.4.4 Airflow Dampers Shall be galvanized steel, 20 gauge. Shall be sized for 22-inch or 16-inch nominal quick-disconnect duct, as identified in the item schedule. Shall be suitable for controlling airflow within the compatible duct system. 4.5 Saddle Hangers Shall be galvanized steel, 14 gauge. Shall be contoured and sized to support the corresponding nominal duct diameter without crushing, deforming, or damaging the duct. Shall be suitable for attachment to the Government???s selected overhead support method. 5. Inspection and Acceptance the Government may inspect delivered items for: Correct item type, nominal size, gauge, and quantity; Galvanized-steel construction; Compatibility of quick-disconnect connections among offered components; Required elbow, wye, tee, reducer, damper, and hanger configurations; Damage, deformation, corrosion, or deficient protective packaging; and Manufacturer literature or other documentation supporting compliance with the salient characteristics. Items that do not meet the stated requirements may be rejected.

United States
Due Oct 8, 2026View bid