Skip to content
SAM.govCloses in 11 days

SOURCES SOUGHT: AIRCRAFT PARKING APRON, RAAF TINDAL, AUSTRALIA

Paving Asphalt
Location
RAAF, United States
Responses due
Oct 20, 2026

Overview

SOURCES SOUGHT FOR CONSTRUCTION OF AN AIRCRAFT PARKING APRON, RAAF TINDAL, AUSTRALIA. This is a Sources Sought announcement only. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement. No telephone calls will be accepted requesting a bid package or solicitation because there is no bid package or solicitation available. In order to protect the procurement integrity of any future procurement, if any, that may arise from this announcement, information regarding the technical point of contract will not be given and no appointments for presentations will be made. The intent of this synopsis is to identify potential sources that are capable of construction of an aircraft parking apron primarily to accommodate six large-frame aircraft, shoulders, multiple taxiways, runway connections, and all supporting infrastructure including utilities, airfield lighting, grading and drainage, access roads, site preparation, and Type III in-ground hydrant fueling system at the Royal Australian Air Force Base Tindal, Australia. The North American Industry Classification System (NAICS) may include Subsection 237310 – Highway, Street, and Bridge Construction. The applicable size standard is $45 million. The magnitude of construction for this project is anticipated to be between $150,000,000 and $200,000,000. Interested sources having the capability to perform this work are invited to submit a completed Questionnaire (Attachment 1) and Experience Questionnaire (Attachment 2), limited to a total of six (6) single-sided, 8.5”x11” pages and 10-point font or larger. Submit qualifications using the attached forms by electronic mail to merbbyjoyce.n.corpuz.civ@us.navy.mil no later than 19 October 2026, 2:00 PM, HST. Complete information must be submitted as the Government will not seek clarification of information provided. The market survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended. NO TELEPHONE CALLS OR FACSIMILIES WILL BE ACCEPTED. Responses received after the deadline or without the required information will not be considered. Since this is a Sources Sought announcement only, evaluation letters will not be issued to any respondent.

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

CO NP BLCA 10(1) South Rim Drive

This is a Request for Quote. Plans and specifications are available. PROJECT NUMBER: CO NP BLCA 10(1) PROJECT NAME: South Rim Drive Improvement PROJECT DESCRIPTION: The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons. SCOPE OF THE WORK: The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive. Principal work elements include, but are not limited to, the following: Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries. Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement. Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings). Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors. Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction. To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway. ANTICIPATED SCHEDULE: Advertisement: Mid-September 15, 2026 Award: Mid-October 2026 Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter) Construction: Early April 2027 – Late May 2027 ESTIMATED COST RANGE: The estimated bid range for Schedule A is between $700,000 and $2,000,000.

MontrosePaving Asphalt
Due Oct 8, 2026View bid
SAM.govCloses today

WON 1665555, FY24 AJJY183012 (P-012), PDI: NORTH AIRCRAFT PARKING RAMP, ANDERSEN AIR FORCE BASE, GUAM

The project is to construct an aircraft parking apron with associated taxiways and shoulders, utility yards, airfield fence, and hydrant fueling pits and piping required to accommodate bombers, tankers, and other aircraft. Work should include all subgrade and subbase work, drainage, airfield lighting, grounding, mooring, markings, fencing, ramp area lighting, and other necessary airfield support.

YigoPaving Asphalt
Due Oct 9, 2026View bid
NYC City RecordCloses today

SMD_Services IDIQ Contract for Annual Cleaning and Inspection of Gravity Roof Tanks at Various NYCHA Buildings, Citywide

Scope of Work:  The annual inspection, cleaning and disinfection of roof tanks on NYCHA properties in compliance with all applicable New York City, New York State, and Federal regulations. at various developments citywide. All work shall comply with applicable laws, codes and standards, including but not limited to NYC Health Code §§ 141.07 & 141.09, Rules of the City of New York, Title 24, Chapter 31, NYC Administrative Code § 17-194, Plumbing Code §§ 606.5 / 606.5.4.3, NYS Sanitary Code, Part 5, ANSI/AWWA/APHA/WEF Industry Standards, Safe Drinking Water Act (SDWA), §28-301.1 of the NYC Construction Code, NYC Local Law 76, Occupational Safety and Health Administration (OSHA) as well as any other regulatory requirements that pertain to gravity water tanks (roof tanks) within the city of New York. Each tank shall be inspected, cleaned, disinfected and sampled for E.Coli and Total Coliform at a minimum annually during each one (1) year period of this contract. Tanks may be cleaned and sampled multiple times a year. Contract Term: 3 years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to 2 one-year renewals. Bid Security: 100% of Contract Minimum. Payment & Performance Bonds: 100% of Minimum. Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law. The Bidder and each subcontractor must be registered with the New York State Department of Labor. See https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ.  This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov  Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-bid Conference will be held on September 9, 2026, at 1:00 PM  To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: https://teams.microsoft.com/meet/284356622821641?p=SIlxBEu2AMZmRVxu4a Meeting ID: 284 356 622 821 641 Passcode: fk9AV7Yt Option 2: Dial in by phone +1-646-838-1534 United States, New York City Phone conference ID: 638894668# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should be sent to the following email address: construction.procurement@nycha.nyc.gov. Question & Answer Release Date: September 23, 2026. Only questions regarding this RFQ submitted to construction.procurement@nycha.nyc.gov (include RFQ number in subject field) prior to Question Deadline will be accepted. In addition to the documents attached below, bidders are directed to review the Special Notices and Conditions, Instructions to Bidders, and General Conditions prior to submitting a bid.  To access these documents, click on the 'Contract Terms' tab above, and then 'Preview Contract Terms,' to download a PDF version. Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_Services_Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Repair of Gravity Roof Tanks (Office of Water Quality) at Various NYCHA Buildings Citywide

Scope of Work: The scope of work includes repairing any leaks, cracks, or damage found in wooden or steel gravity tanks, including but not limited to conical covers, flat decking, hatch doors, ladders, plugs, strainers, piping, plumbing components, valves, electrical systems, probes, control wiring, conduit, co applicable city, state, and federal codes, regulations, all materials, equipment, and workmanship used in these repairs shall comply with all relevant city, state, and federal codes, as well as applicable regulations and industry standards governing construction, safety, and domestic water systems. Contract Term: three years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to two one-year renewals. Bid Security: 100% of Contract Minimum ($50,000). Payment & Performance Bond:100% of Minimum ($50,000). Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law .The Bidder and each subcontractor must be registered with the New York State Department of Labor. https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ. This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov. Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-Bid Conference will be held on September 9, 2026, at 3:00 PM, and will be conducted remotely via Microsoft Teams meeting. To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: Join: https://teams.microsoft.com/meet/247843415108182?p=s7S895ctg6lwFXC4rX Meeting ID: 247 843 415 108 182 Passcode: f4oN2E3n Option 2: Dial in by phone +1 646-838-1534,,168007653# United States, New York City Phone conference ID: 168 007 653# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should only be sent to the following email address: construction.procurement@nycha.nyc.gov.  Question & Answer Release Date: September 23, 2026 Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_A&CM_RFQ #517985 - Elevator Rehabilitation at Cassidy Lafayette/Woodson Houses

Scope of Work * The Work under this Contract (RFQ No. 517985  Elevator Package) consists of the rehabilitation, modernization, maintenance, and service of twelve (12) elevators across six (6) residential buildings, including eight (8) elevators in four (4) buildings at Cassidy-Lafayette Houses and four (4) elevators in two (2) buildings at Woodson Houses. The Contractor shall provide all labor, materials, equipment, supervision, and incidental services necessary to complete the Work in accordance with the Contract Documents. * The scope includes, but is not limited to, the removal and replacement of existing elevator systems and the furnishing and installation of new elevator equipment, including machines, controls, hoistway components, car enclosures, doors, rails, communication systems, safety devices, and associated electrical components. The Work also includes testing, inspection, commissioning, training, and coordination with NYCHA and other trades, including a separate electrical package. * The Work shall be performed in phased construction to maintain building operations, with coordination requirements intended to minimize service interruptions and impacts to residents. The Contractor shall comply with all scheduling, outage duration, and performance requirements established in the Contract Documents. * In addition to construction and modernization activities (Part A), the Contractor shall enter into a separate Maintenance and Service Agreement (Part B) to provide ongoing elevator maintenance and support services following completion of modernization.   RFQ Solicitation Timetable A non-mandatory virtual pre-bid conference will be held on 09/23/2026 at 11:00 am, via Microsoft Teams. Pre bid Teams Meeting information: (646) 838-1534 Conference ID: (232 863 912 982 698) Passcode: nx9B2q4T. Although attendance is not mandatory; it is strongly recommended that all interested vendors attend. https://teams.microsoft.com/meet/232863912982698?p=fwqq9XfVdWnGivNGMi All questions related to this RFQ are to be submitted via email to the A&CM Procurement Unit at acm.procurement@nycha.nyc.gov with the RFQ number as the Subject line by no later than 09/25/2026 on 2:00PM Bidders will be permitted to ask additional questions at the Pre-bid Conference. Responses to all submitted questions will be available for public viewing in Sourcing under the RFQ. Bid Submission Requirements Vendors shall electronically upload a single .pdf containing ALL components of the bid into iSupplier by the RFQ Bid Submission Deadline. NYCHA will NOT accept hardcopy Bids or bids via e-mail, fax, or mail. Instructions for registering for iSupplier can be found at http://www1.nyc.gov/site/nycha/business/isupplier-vendor-registration.page After Bidder registers for iSupplier, it typically takes 24 to 72 hours for Bidders iSupplier profile to be approved. Site Visits - September 24, 2026 RFQ Question Deadline - September 25, 2026 - 02:00 PM Question and Answer Release Date - October 01, 2026  It is Vendors sole responsibility to complete iSupplier registration and submit its Bid before the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. For assistance regarding iSupplier please email Procurement@nycha.nyc.gov

New York
Due Oct 8, 2026View bid
SAM.govCloses today

KB Duct List

Salient Characteristics SpecificationTitle: Galvanized Steel Quick-Disconnect Ductwork and Components for Air-Conditioning SystemSubject: Supply of modular galvanized steel quick-disconnect ductwork, fittings, dampers, and support hangers.Basis of Design: The part numbers below are for reference and configuration cross-reference. Products offered may be from another acceptable manufacturer, provided they meet or exceed all salient characteristics and are fully compatible with the complete ductwork system.1. Scope and PurposeThis requirement is for the supply and delivery only of galvanized steel, modular quick-disconnect ductwork and associated fittings for an air-conditioning system. The supplied components shall form a mutually compatible duct system consisting of straight duct sections, reducers, wye connectors, elbows, airflow dampers, and saddle hangers.Installation, field fabrication, field welding, and connection to existing equipment are not included unless specifically added elsewhere in the solicitation.2. General Salient Characteristics. All offered items shall meet the following minimum requirements: Material: Items 1 through 26 shall be galvanized steel only. No stainless steel, aluminum, plastic, or uncoated carbon-steel substitutes shall be accepted.System Compatibility: All duct, fittings, dampers, and hangers shall be compatible with the specified quick-disconnect duct system. Components of the same nominal duct diameter shall connect directly without adapters, field welding, rivets, sheet-metal screws, or permanent field modification.Quick-Disconnect Connection: Straight duct sections, reducers, wye connectors, elbows, tees, and dampers shall use a quick-disconnect connection configuration compatible with the remaining supplied components. Connection features shall permit assembly and disassembly of the duct system without damage to the duct or fittings.Nominal Dimensions: Duct diameters and fitting dimensions listed in the schedule are nominal inside diameters unless the manufacturer???s standard quick-disconnect system identifies dimensions differently. Reducers shall transition between the listed inlet and outlet diameters. Fittings shall be sized to directly mate with the corresponding duct diameter.Gauge Requirements: Straight duct sections and dampers shall be 20-gauge galvanized steel where identified in the schedule. Reducers, elbows, wye connectors, tees, and 90-degree fittings shall be 18-gauge galvanized steel where identified in the schedule. Saddle hangers shall be 14-gauge galvanized steel where identified in the schedule.Quality and Condition: Products shall be new, free of corrosion, dents, sharp edges, cracks, deformation, damaged coating, or manufacturing defects that would prevent proper assembly or service. Duct sections shall be round, and fittings shall retain their intended shape to allow proper connection. Components shall be packaged and shipped to prevent damage or distortion in transit.Equal Products: An offered equal product shall meet every listed dimensional material, gauge, connection, configuration, and quantity requirement. The offeror shall provide manufacturer specifications or product literature sufficient to verify compliance when requested.3. Required Items ScheduleItem. Required Item / Salient Characteristics. Minimum Material / Gauge. Qty. Reference No.*1. Quick-disconnect straight duct, nominal 24-inch diameter. Galvanized steel, 20 ga 17 EA 10024.2. Quick-disconnect reducer, 24-inch inlet to 22-inch outlet Galvanized steel, 18 ga 5 EA 16024.3. Quick-disconnect straight duct, nominal 22-inch diameter Galvanized steel, 20 ga 20 EA 10022.4. Quick-disconnect reducer, 22-inch inlet to 20-inch outlet Galvanized steel, 18 ga 5 EA 16022.5. Quick-disconnect straight duct, nominal 20-inch diameter Galvanized steel, 20 ga 17 EA 10020.6. Quick-disconnect reducer, 20-inch inlet to 18-inch outlet Galvanized steel, 18 ga 5 EA 16020.7. Quick-disconnect 45-degree wye connector, nominal 24-inch duct size Galvanized steel, 18 ga 1 EA 14224.45.8. Quick-disconnect 45-degree elbow, nominal 22-inch duct size Galvanized steel, 18 ga 1 EA 12022.45.9. Quick-disconnect manual butterfly valve airflow damper, nominal 22-inch duct size Galvanized steel, 20 ga 1 EA 19422.10. Quick-disconnect straight duct, nominal 18-inch diameter Galvanized steel, 20 ga 28 EA 10018.11. Quick-disconnect tee, 18-inch ?? 18-inch ?? 18-inch Galvanized steel, 18 ga 1 EA 14318.12. Quick-disconnect straight duct, nominal 16-inch diameter Galvanized steel, 20 ga 19 EA 10016.13. Quick-disconnect reducer, 18-inch inlet to 16-inch outlet Galvanized steel, 18 ga 3 EA 16018.14. Quick-disconnect 45-degree elbow, nominal 16-inch duct size Galvanized steel, 18 ga 2 EA 12016.45.15. Quick-disconnect manual butterfly valve airflow damper, nominal 16-inch duct size Galvanized steel, 20 ga 2 EA 19416.16. Quick-disconnect 90-degree elbow, nominal 20-inch duct size Galvanized steel, 18 ga 2 EA 12020.90.17. Saddle hanger sized for nominal 24-inch duct Galvanized steel, 14 ga 14 EA 17024.18. Saddle hanger sized for nominal 22-inch duct Galvanized steel, 14 ga 14 EA 17022.19. Saddle hanger sized for nominal 20-inch duct Galvanized steel, 14 ga 14 EA 17020.22. 16-inch galvanized clamp with white nitrile gasket, 27 EA 13016-GA-N.23. 18-inch galvanized clamp with white nitrile gasket, 30 EA 13018-GA-N.24. 20-inch galvanized clamp with white nitrile gasket, 25 EA 13020-GA-N.25. 22-inch galvanized clamp with white nitrile gasket, 28 EA 13022-GA-N.26. 24-inch galvanized clamp with white nitrile gasket, 24 EA 13024-GA-N.*Reference numbers are not brand-name requirements and are included only to identify the intended configuration and compatibility standard. Galvanized Ducting shall be Standard 5-feet Lengths and 11-inch Galvanized Standard Adjustable Sleeves where applicable.4. Component-Specific Requirements shall be galvanized steel:4.1 Saddle Hangers (items 17-21) used for handing duct systems and reducing sway Shall be nominal 24-inch diameter 14 ga 14 EA 17024, 22-inch diameter 14 ga 14 EA 17022, 20-inch diameter 14 ga 14 EA 17020, 18-inch diameter 14 ga 18 EA 17018, or 16-inch diameter 14 ga 14 EA 17016, as identified in the item schedule. Shall use the required quick-disconnect end configuration.4.2 Reducers Shall be galvanized steel, 18 gauge. Shall provide the listed nominal transitions: 24 x 22 inches, 22 x 20 inches, 20 x 18 inches, and 18 x 16 inches. Shall have quick-disconnect ends compatible with the adjoining duct sections.4.3 Elbows, Wye Connector, and Tee, shall be galvanized steel, 18 gauge. Shall have the listed nominal diameter and directional configuration. The wye connector and applicable elbows shall be 45 degrees as listed. The 20-inch elbow shall be 90 degrees. The tee shall be 18 inches ?? 18 inches ?? 18 inches. All ends shall be compatible with the required quick-disconnect duct system.4.4 Airflow Dampers Shall be galvanized steel, 20 gauge. Shall be sized for 22-inch or 16-inch nominal quick-disconnect duct, as identified in the item schedule. Shall be suitable for controlling airflow within the compatible duct system. 4.5 Saddle Hangers Shall be galvanized steel, 14 gauge. Shall be contoured and sized to support the corresponding nominal duct diameter without crushing, deforming, or damaging the duct. Shall be suitable for attachment to the Government???s selected overhead support method. 5. Inspection and Acceptance the Government may inspect delivered items for: Correct item type, nominal size, gauge, and quantity; Galvanized-steel construction; Compatibility of quick-disconnect connections among offered components; Required elbow, wye, tee, reducer, damper, and hanger configurations; Damage, deformation, corrosion, or deficient protective packaging; and Manufacturer literature or other documentation supporting compliance with the salient characteristics. Items that do not meet the stated requirements may be rejected.

United States
Due Oct 8, 2026View bid