Skip to content
NYC City RecordCloses in 6 days

Bid Extension: Requirement Contract for Installation of V/C Floor Tile in Apartments- Development Name, Located in Manhattan Neighborhood (MN04), and (MN05), Manhattan.

Location
New York, United States
Responses due
Aug 12, 2026

Overview

Requirement Contract for Installation of V/C Floor Tile in Apartments- Development Name, Located in Manhattan Neighborhood (MN04), and (MN05), Manhattan. No Bid Security Required. NYCHA intends to separately solicit and award a series of Eight (8) requirement contracts for Installation of V/C Floor Tile in Apartments-Development Specific pursuant to RFQ#s: 523204- Amsterdam Houses, 523205- Douglas Houses, 523206-DeHostos Houses, 523207- Strauss Houses, 523208- East River Houses, 523209- Jefferson Houses, 523210-Wagner Houses,  and 523211-Wilson Houses Consolidation (or this Bid Series). Contract Term: The Term of this contract shall be for a period of three (3) years from the award date established on NYCHAs Blanket Purchase Order or the issuance of the Notice to Proceed Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this contract with up to two (2) one-year renewal periods. Limiting Award Provision: NYCHA has determined that it is in the best interest of NYCHA to award only one (1) of the Requirement contracts in this Bid Series to the lowest responsive, responsible individual Contractor, subject to the award limiting language (Step 1). Subject to NYCHAs responsive and responsibility determinations of the Bidder and the award limiting language set forth herein, to the extent there are other Requirement contracts in this Bid Series that are not yet awarded after Step 1, NYCHA, in its sole and absolute discretion, may award up to One (1) additional contract(s) to a Contractor or Contractors that has, pursuant to Step 1, been awarded the maximum number of contracts in this Bid Series (Step 2). Solicitations Subjected to Davis Bacon Prevailing Wage Schedule: Labor Law 220i Registration Certificates and Certification Bidders are hereby notified that effective as of December 30, 2024, as a precondition to submitting its Bid, the Bidder and each subcontractor identified by the Bidder in its Bid, must be registered with the New York State Department of Labor (NY DOL) pursuant to Article 8, Section 220-i of the New York State Labor Law (LL 220-i). Instructions on how to register can be found at https://dol.ny.gov/contractor-and-subcontractor-landing. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.   Pre-qualification: To be considered eligible for the award, a bidder must pre-qualify as an 'Approved Supplier via NYCHA-Tile Pre-Qualification List (PQL) and appear on the active approved vendor list https://www.nyc.gov/site/nycha/business/nycha-pql.page Section 3 REO & OEO Plans: Section 3 REO & OEO Plans must be submitted via eComply, https://nycha.ecomply.us/ and no later than Bid Submission Deadline.   For eComply log-in assistance contact eComply Tech support: support@ecomplysolutions.com & For eComply inquiries contact: ecomply.support@nycha.nyc.gov For Section 3 submissions assistance contact NYCHAs SMP Vendor Development & Support: procurement.support@nycha.nyc.gov    Reminder: DO NOT include Section 3 documentation within bid submission via iSupplier.   pre-Bid Conference: NYCHA hosted Pre-Bid Conferences to launch the rollout of the solicitation of the NYCHA Tile Program-Phase III/ Installation of Vinyl Composition Floor Tile in Apartments bid series. * Friday, 05/29/2026*- Bronx Property Management & Bronx Developments * Friday, 06/05/2026*- Brooklyn Property Management & Brooklyn Developments * Wednesday, 06/17/2026*- Manhattan Property Management & Manhattan Developments and * Wednesday, 06/24/2026*-Queens& Staten Island Property Management & Queens and Staten Island Developments.  * The information previously presented (*) is applicable here, hence a Pre-Bid Conference will not be hosted for this solicitation series.   Questions pertaining to this Solicitation Series-RFQ#523204-523211 and submitted via the NYCHA Cyclical Procurement mailbox at: cyclical.procurement@nycha.nyc.gov (include RFQ number in subject field) prior to Question Deadline will be accepted.   RFQ Question Submission Deadline: Friday, 07/10/2026 at 2:00PM Question and Answer Release Date: Friday, 07/17/2026 at 2:00PM   In addition to the documents attached below, bidders are directed to review the Special Notices and Conditions, Instructions to Bidders, and General Conditions prior to submitting a bid.  To access these documents, click on the 'Contract Terms' tab above, and then 'Preview Contract Terms,' to download a PDF version.   Please note that in the event NYCHA receives no responses in connection with this RFQ by the original bid submission deadline, the bid submission deadline shall be extended automatically for seven (7) calendar days.  The foregoing extension does not in any way limit NYCHA's right to extend the bid submission deadline for any other reason.   Prior to submitting a bid, please confirm that your bid response includes all required forms & Documentation, and that all required forms and documentation are properly completed, signed, and notarized, where applicable.

Source: NYC City RecordView in Constructeams

Similar open bids

NYC City RecordCloses today

Brooklyn Bridge Park Pier 1 LED Lighting Install

Brooklyn Bridge Park is an eighty-five (85) acre waterfront park in Brooklyn, NY. The Pier 1 section of the park is in need of lighting improvements to replace the aging metal halide lights installed during the build-out of the park. All proposed LED light fixtures will need to be tied into a recently installed new lighting panel. Brooklyn Bridge Park is Seeking proposals for an electrical contractor to remove the existing metal halide lighting fixtures and install the LED lighting fixtures and associated wiring.

New York
Due Aug 5, 2026View bid
SAM.govCloses today

Z--Grand Coulee Washington Power Plant Turbine Repair

Work is located at Grand Coulee Dam in Okanogan County, Washington. Principal components of work to be performed include work necessary to access and repair turbine runners and stay vanes in the Nathaniel Nat Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating.

Grand Coulee DamWaterproofing Caulking
Due Aug 5, 2026View bid
SAM.govCloses today

Replace HVAC West Fitness Center

Design and Construction service to completely replace the old heating and cooling system in the West side Fitness Center B585. Design, provide and install a new complete Heating, Ventilation, and Air Conditioning (HVAC) system. All services and materials to complete the work IAW the SOW. See Attachment 1 - SOW for more details. The budget parameters for this budget are between $1,000,000.00 and $1,400,000.00.

Kirtland AFBPlumbing · HVAC Mechanical
Due Aug 5, 2026View bid
SAM.govCloses today

Repair BEQ G702/G703

Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.

Camp Lejeune
Due Aug 5, 2026View bid
SAM.govCloses today

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

United StatesElectrical
Due Aug 5, 2026View bid
SAM.govCloses today

Presolicitation- FCI Safford- Install Carbon Monoxide Detection System

Pre Solicitation Notice Synopsis THIS IS A SYNOPSIS OF PROPOSED CONTRACT ACTION. THIS IS NOT A SOLICITATION OR A REQUEST FOR QUOTATIONS. PRE-SOLICITATION NOTICE IS POSTED IN THE GOVERNMENTWIDE POINT OF ENTRY IN ACCORDANCE WITH FAR 12.201-1(c)(2) [Deviation April 2026]. The Federal Bureau of Prisons (FBOP) announces a proposed contract action for the award of a firm-fixed-price commercial supply/service & construction contract for procurement of installation of a carbon monoxide detection system for the Federal Correctional Institution Safford located in Safford, AZ. FCI Safford is a federal correctional facility located at 1529 W. US HWY 366, Safford, AZ 85546. This acquisition will be conducted using FAR Part 12 [Deviation April 2026], Acquisition of Commercial Products and Commercial Services, in conjunction with the simplified procedures at FAR 12.201?1 [Deviation April 2026]. In accordance with FAR 12.201?1(c)(2) [Deviation April 2026], quotations will be solicited directly from at least three sources. This pre?solicitation notice is posted in the Governmentwide Point of Entry (GPE) to promote competition to the maximum extent practicable. The requirement consists of all labor, materials, equipment, tools, supervision, and warranties necessary to install the carbon monoxide detection system. The contractor and any subcontractors must be reputable, holding valid and current contracting licenses. If required, personnel must provide certifications or documented proof of experience, demonstrating competency in executing the project. Proof must be provided to the Contracting Officer (CO) or COR upon request. All work and materials must comply with applicable local, state, and federal codes, including the latest editions of the International Building Code, NFPA, Life Safety Code, OSHA, American Correctional Association Standards, and other relevant regulations. This project involves the design, supply, installation, integration, testing, and commissioning of a Carbon Monoxide (CO) detection system that will be fully interfaced with the existing fire detection and alarm system (FDAS) in accordance with applicable codes and standards. The contractor is required to design and install carbon monoxide (CO) detectors in compliance with the latest National Fire Protection Association (NFPA) that will be compatible with our current Fire Alarm system, the Edwards EST3 system installed in 2022. All items must meet or exceed the specifications that will be provided in the forthcoming Request for Quotations (RFQ). Delivery of supplies and installation will be at FCI Safford 1529 W. US HWY 366, Safford, AZ 85546. The NAICS code for this requirement is 238210 – Electrical Contractors and Other Wiring Installation Contractors. The anticipated award date for this requirement is August 18, 2026. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. If you have questions about SAM, Government procurements in general, or need assistance in the preparation of your bid/proposal/offer, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. This acquisition is being conducted under FAR Part 12 [Deviation April 2026] for commercial supplies/service & construction and has no set aside restrictions. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 [Deviation April 2026] in the Representations & Certifications section of your www.sam.gov registration). This synopsis is intended only for those who would be entering into a Prime contract with the FBOP for the entirety of this project. The FBOP does not award subcontracts. Subcontracts (if applicable/necessary) are the responsibility of the Prime contractor. The FBOP has no privity of the contract with subcontractors.

SaffordElectrical
Due Aug 5, 2026View bid