Skip to content
SAM.govCloses in 15 days

John Day Dam Powerhouse HVAC Upgrades

Plumbing · HVAC Mechanical
Location
Rufus, United States
Responses due
Aug 20, 2026

Overview

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1–14 located in Sherman County, Oregon, and Units 15–16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800?171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. Systems must be integrated into a new automated digital HVAC control system. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. HVAC upgrades include new intake and exhaust ducting to prevent smoke propagation through the building in the event of fire, and fire protection measures at all penetrations. HVAC and the building fire protection systems must be fully integrated, replacing all existing pneumatic controls with an integrated digital control system which is capable of functioning to selectively shut down the HVAC to isolate sectors in the event of a fire or smoke event. The work includes mechanical and controls provisions for free cooling using passive outside air during cold nights and modifications to existing intakes, louvers, and penetrations to support smoke ventilation. Localized HVAC units such as mini-splits will be installed for specific spaces, with new electrical supplies, piping, insulation, penetrations, and data reporting to the central HVAC control system. Work will be performed in an active, operational Powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including areas below headwater with nuisance water intrusion risks. Certain pumps must remain operational throughout construction, presenting noise and safety hazards that must be managed. The existing fire suppression system must remain active during construction and be recommissioned upon project completion. Work includes ductwork installation and protection of floor penetrations in close proximity to operational high-voltage electrical busbars, emphasizing strict delineation and safety control of work areas. New systems to be installed must not use refrigerants subject to future refrigerant phase-out schedules (no refrigerant subject to phase-out at any point in the future may be used). Work includes extensive structural penetrations and modifications to support permanent equipment installation including piping, ductwork and new condensing systems. Asbestos abatement and lead mitigation may be required. The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $25M and $100M. This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. This synopsis is not a request for quotes (RFQ), proposals (RFP), or in an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is mid-August 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications and drawings will be included with the solicitation once issued. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued. Contractors are responsible for checking this page for any update(s) to this notice. Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

USACE NWD DESIGN BUILD/DESIGN BID BUILD REGIONAL MATOC

SYNOPSIS The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) will be soliciting for a Regional Design Build/Design Bid-Build Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). The proposed project will be a competitive, firm-fixed price (FFP) construction contract MATOC. Project Scope: Civil: Site utilities, drainage, paving, waterstop installation, and various geotechnical work. Structural/Architectural Systems: Concrete, structural frames, hydraulic steel structures, fall protection, roofing, elevators, new buildings and building renovation. Electrical Systems: Power distribution, generators, lighting, and control systems (SCADA/PLC, fire/security, ICT). Mechanical Systems: Building MEP (HVAC, plumbing, fire protection) and industrial equipment (pumps, cranes, hydraulics, compressors). Work will be primarily located within the Portland District's area of operations (Southwest Washington and Oregon), with potential for projects in the Seattle and Walla Walla Districts. Background: The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) is going to solicit a Multi-Award Task Order Contract (MATOC). The scope of this contract will encompass Design-Build and Design-Bid-Build projects involving new construction, repair, and renovation of civil works projects, facilities, roadways, and recreational areas within the Northwestern Division (NWD) Portland District (NWP), Walla Walla District (NWW), and Seattle District (NWS) project sites. The proposed project will be multiple Firm-Fixed Price (FFP) contracts. Responses to this sources sought announcement will be used by the government to determine the acquisition strategy. Contract Period of Performance: The estimated Period of Performance for this contract is 5 Years, FY27-FY32 Magnitude of Construction: The estimated capacity of the MATOC is $99,000,000.00. Set Asides and Codes: Total Small Business Set-Aside (FAR 19.5). The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990, “Other Heavy and Civil Engineering Construction”. The related size standard is $45M. The Product Service Code (PSC) is Z2QA - Repair or Alteration of Real Property (Public or Private). Selection Process: The award will be made based on the best overall value to the Government. The process will be conducted in two phases. Phase One will evaluate offeror qualification packages to select the most highly qualified firms to advance to Phase Two. Phase Two will involve a full proposal evaluation, including price, based on a seed task order. The Government intends to award without discussions but reserves the right to conduct them if necessary. All non-price factors, when combined, are approximately equal to price. The Government will initially evaluate offerors’ qualification packages submitted in response to Phase One of this solicitation. After evaluation of Phase One qualification packages, the government will select up to ten of the most highly qualified firms to submit Phase Two proposals. Upon the conclusion of Phase One, the solicitation will be amended to include the Phase Two evaluation factors including price and the scope of work for the first Task Order 0001 that will be awarded along with the MATOC IDIQ contracts. Phase One qualification packages and evaluations will not be carried over into Phase Two. All offerors selected to propose for Phase Two will be evaluated only on the Evaluation Factors outlined in the Phase Two RFP. Phase Two of the solicitation will include the Statement of Work and the specifications for Task Order 0001. The estimated construction magnitude for Task Order 0001 is between $5,000,000 and $10,000,000. A pre-proposal conference/site visit may be conducted during Phase Two. Phase Two offerors will have a minimum of 30 days to submit their proposals. Discussions: The government intends to award without discussions but reserves the right to conduct discussions if deemed to be in the government’s best interest. Anticipated Solicitation Release Date: The government anticipates releasing the solicitation aound mid August 2026. The closing date for proposals will be approximately 45 days later. Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted. System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Point of Contact: The USACE-NWP points of contact for this action are Andrew Sprys at Andrew.J.Sprys@usace.army.mil and Justin Figueredo at Justin.F.Figueredo@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice. Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Michael Stearns at 410-962-5674 or Michael.D.Stearns@usace.army.mil. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT MID AUGUST 2026. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

Portland
Due Aug 5, 2026View bid
SAM.govCloses today

61--MOTOR,ALTERNATING C

Proposed procurement for NSN 6105011953332 MOTOR,ALTERNATING C: Line 0001 Qty 3 UI AY Deliver To: KURE REPAIR AND SUPPLY FACILITY By: 0020 DAYS ADO Approved source is 54395 M-2320-1. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

United States
Due Aug 6, 2026View bid
SAM.govCloses today

Z--GRSM, Roof Replacements on 5 Bldgs, Collins Creek Picnic area (3 Bldgs.) and Deep Creek Picnic Area (2 Bldgs.), Swain County, NC

ATLANTA
Due Aug 6, 2026View bid
SAM.govCloses today

Bldg 229 Demo Amendment 2

Des Moines, Iowa
Due Aug 6, 2026View bid
Delaware Open BidsCloses today

Townsend Boiler & Chiller Replacement

Delaware
Due Aug 6, 2026View bid
Delaware Open BidsCloses today

Archives Shingle Roof Replacement

Delaware
Due Aug 6, 2026View bid