Skip to content
LA RAMPCloses in 7 days

Central Business District (CBD) Sewer Rehabilitation Unit 2 - 12th & Flower to Pico & Santee

Location
California, United States
Responses due
Aug 12, 2026

Overview

The scope of work consists of rehabilitating approximately 3,678 linear feet of existing 39-inch semi-elliptical brick sewer with Ultra-Violet Cured-in-Place Pipe (UV-CIPP) liner, constructing five (5) pits, partially removal reconstruction and rehabilitation of three (3) existing sewer maintenance holes, constructing three (3) new 48-inch maintenance holes, reconnecting a 10-inch lateral sewer, a 15-inch stub and four (4) existing house connections. Sewer inspection, sewer cleaning, debris removal and disposal, sewer bypass, traffic control, and odor control are also part of the project. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/

Source: LA RAMPView in Constructeams

Similar open bids

LA RAMPCloses today

2710002 SAN PEDRO HIGH SCHOOL - OLGUIN CAMPUS - NEW OBSTACLE COURSE

NEW OBSTACLE COURSE

California
Due Aug 5, 2026View bid
SAM.govCloses today

Z--Grand Coulee Washington Power Plant Turbine Repair

Work is located at Grand Coulee Dam in Okanogan County, Washington. Principal components of work to be performed include work necessary to access and repair turbine runners and stay vanes in the Nathaniel Nat Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating.

Grand Coulee DamWaterproofing Caulking
Due Aug 5, 2026View bid
NYC City RecordCloses today

Brooklyn Bridge Park Pier 1 LED Lighting Install

Brooklyn Bridge Park is an eighty-five (85) acre waterfront park in Brooklyn, NY. The Pier 1 section of the park is in need of lighting improvements to replace the aging metal halide lights installed during the build-out of the park. All proposed LED light fixtures will need to be tied into a recently installed new lighting panel. Brooklyn Bridge Park is Seeking proposals for an electrical contractor to remove the existing metal halide lighting fixtures and install the LED lighting fixtures and associated wiring.

New York
Due Aug 5, 2026View bid
SAM.govCloses today

Replace HVAC West Fitness Center

Design and Construction service to completely replace the old heating and cooling system in the West side Fitness Center B585. Design, provide and install a new complete Heating, Ventilation, and Air Conditioning (HVAC) system. All services and materials to complete the work IAW the SOW. See Attachment 1 - SOW for more details. The budget parameters for this budget are between $1,000,000.00 and $1,400,000.00.

Kirtland AFBPlumbing · HVAC Mechanical
Due Aug 5, 2026View bid
SAM.govCloses today

Repair BEQ G702/G703

Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.

Camp Lejeune
Due Aug 5, 2026View bid
SAM.govCloses today

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

United StatesElectrical
Due Aug 5, 2026View bid