Central Business District (CBD) Sewer Rehabilitation Unit 2 - 12th & Flower to Pico & Santee
- Location
- California, United States
- Responses due
- Aug 12, 2026
Overview
Source: LA RAMPView in Constructeams
Source: LA RAMPView in Constructeams
NEW OBSTACLE COURSE
Work is located at Grand Coulee Dam in Okanogan County, Washington. Principal components of work to be performed include work necessary to access and repair turbine runners and stay vanes in the Nathaniel Nat Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating.
Brooklyn Bridge Park is an eighty-five (85) acre waterfront park in Brooklyn, NY. The Pier 1 section of the park is in need of lighting improvements to replace the aging metal halide lights installed during the build-out of the park. All proposed LED light fixtures will need to be tied into a recently installed new lighting panel. Brooklyn Bridge Park is Seeking proposals for an electrical contractor to remove the existing metal halide lighting fixtures and install the LED lighting fixtures and associated wiring.
Design and Construction service to completely replace the old heating and cooling system in the West side Fitness Center B585. Design, provide and install a new complete Heating, Ventilation, and Air Conditioning (HVAC) system. All services and materials to complete the work IAW the SOW. See Attachment 1 - SOW for more details. The budget parameters for this budget are between $1,000,000.00 and $1,400,000.00.
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI