LA RAMPCloses in 27 days
Central Business District (CBD) Sewer Rehabilitation Unit 12 - Alameda Street to 18th Street (Re-Bid)
- Location
- California, United States
- Responses due
- Sep 2, 2026
Overview
The scope of work consists of rehabilitating approximately 6,387 feet an existing 40-inch circular brick sewer by Ultraviolet Cured In-Place Piping (UVCIPP). Most of the rehabilitation work is expected to be performed by access through existing maintenance holes. The scope of work also includes rehabilitation of 20 maintenance hole structures which include 4 junction structures, top 6-ft. of all maintenance holes shafts will be removed and reconstructed with 30-inch frames and covers. The project entails the cleaning, removal and disposal of the fallen bricks and other debris, preparing the sewer for UVCIPP liner installation, re-establishing lateral sewers and house connections. Temporary odor control, sewer bypass, and traffic control are also parts of the scope of work.
▬
● See bid package for full scope & details
●● Bid package only on RAMPLA- download Part 1 to be a planholder
● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Source: LA RAMPView in Constructeams